论文部分内容阅读
详细介绍了首都航天机械公司(以下简称首航公司)在建立机械加工制造单元时确定工艺布局的一整套实用步骤和方法,该方法适应航天产品多品种、变批量的生产特点,包括从确定零件族到形成制造单元平面布局图的全过程。另外,也介绍了工艺优化的相关内容。
This paper introduces in detail the set of practical steps and methods for determining the layout of the process during the establishment of a machining unit by Capital Aerospace Machinery Company (hereinafter referred to as “First Flight Company”). The method adapts to the production features of multi-species and variable-volume aerospace products, Family to create a flat layout of manufacturing units of the entire process. In addition, also introduced the process optimization related content.