在进行堵水作业施工过程中,通常需要下放两次投送管柱才能实现堵水完井作业功效,为提高作业施工效率,降低作业成本,我们经过多方面的调查研究,在认真分析堵水及完井作业施工具体情况的基础上,进行了堵水完井一体化工艺技术研究。并通过20口井的现场应用,其不仅简化了施工工序,提高了作业时效,而且节约了生产成本,降低了劳动强度。因此,该工艺值得进一步推广应用。
In the process of water shutoff operation, it is usually necessary to put down the pipeline twice in order to achieve the effect of plugging and completion. In order to improve the construction efficiency and reduce the operating cost, after careful investigation and study, And completion of construction work on the basis of the specific circumstances, carried out a water plugging completion of integrated technology research. And through the field application of 20 wells, which not only simplifies the construction process, improve the operating timeliness, but also save production costs and reduce labor intensity. Therefore, the process is worth further promotion and application.