EPC合同模式并非适用于所有项目。当承包商选择或接受EPC合同模式时,至少要做好以下五个方面的工作。做好设计管理工作EPC合同中的设计(Engineering)工作区别于传统合同模式下的设计(Design)工作,它包括概念设计、详细设计、施工图设计等方面。根据国际上相关经验统计,EPC合同设计阶段对项目成本的影响达75%左右,因此做好设计管理工作能为有效地控制项目成本奠定坚实的
EPC contract mode does not apply to all projects. When contractors choose or accept EPC contract mode, at least the following five aspects should be done. Doing Design Management Work in EPC contracts is different from designing work in the traditional contract mode. It includes conceptual design, detailed design and construction drawing design. According to relevant international experience and statistics, the EPC contract design stage has an impact on the project cost of about 75%, so doing design management can lay a solid foundation for effective project cost control