【摘要】土钉支护法是人防工程深基坑中经常采用的方法,这一方法主要是为了提高不良土层的安全性而采用的,具有其独特的优点,在深基坑施工中获得广泛采用。本文着重阐述了土钉支护的基本特点,分析了其主要的技术要点和基本优点,对其在人防工程深基坑中的重要作用做出了详细说明。
【关键词】人防工程;深基坑;土钉支护;技术分析
【 abstract 】 soil nail a custodian of the deep foundation pit of civil air defense projects is usually used in method, this method is mainly in order to improve the safety of the soil and the poor, has its unique advantages, in deep foundation pit construction has won extensive use. This paper expounds the basic characteristics of soil nailing support, analyzed the main technical points and fundamental advantages, the deep foundation pit of civil air defense projects the important role makes a detailed explanation.
【 keywords 】 of civil air defense projects; Deep foundation pit; Soil nailing support; Technical analysis
中图分类号:TD3文献标识码:A文章编号:
前言
为确保人防建筑物的稳定性和可适用性,深基坑的开挖越来越多。深基坑支护技术成为保证保证人防工程施工质量的关键,也成为提高人防工程质量、效率及施工的安全性的重要基础性施工方法。人防工程建设中经常会遇到深基坑,应对这种情况的主要方法是在深基坑中采用土钉支护技术。采用土钉墙支护的优点主要表现在工期短,结构轻型,所使用材料造价低,施工操作方便快捷等方面【1】。土钉支护由于从地面实施了分层成孔、插筋、注浆支护等技术措施,因此在人防工程的深基坑中发挥了较好的作用,保持了稳定性以及工程质量。因为这些技术较好的使土钉与土体形成复合体,提高了边坡的稳定性和承载能力,有效防止边坡突然坍方。
人防工程深基坑中土钉支护的相关技术探讨
在人防工程的深基坑施工中,土钉墙使用的主要材料是钢筋。土钉墙的主要目的是要增加边坡的稳定型,这种稳定性的实现主要是依靠土与加筋件之间所产生的强大的废接力。在人防工程的深基这种废接力会使坑中土体拉结成整体,加之施工过程中的混凝土喷射会使边坡稳定性得以很大提高。土钉支护的施工方式较为多样,具体的施工方法应该按照深基坑的具体情况选择。土钉按照施工方法的不同,可分为钻孔注浆型土钉、打入型土钉和射入型土钉三类。这三种方式中适用范围为广泛和使用频率最高的为钻孔注浆型土钉。钻孔注浆型土钉的支护结构主要是由喷射混凝土、注浆铺杆和钢筋网三部分组成的,这三部分联合作用所提供的支撑力对边坡起到一定的固定作用。此技术在人防工程深基坑中的土钉支护支护不但包括一般的土层,更为重要的是针对一些特殊的土地状况,比如流砂、软土、厚杂填土、强膨胀土和砂砾石等不良地层。
土钉支护在人防工程中深基坑中的具体应用
首先,土钉支护在解决人防工程深基坑中所出现的问题发挥了重要的作用,极为有效的解决了深基坑边坡的稳定性以及强度等严重影响到工程质量的关键问题,但是如何使土钉支护技术更加有效与科学的发挥作用还应该是相关人员进行探讨的重要问题。在工程开始之前应该进行的一项主要工作是分析与综合人防工程中深基坑的具体情况,选择合适的土钉墙支护设计方案。另外,还有一种客观因素对其产生了尤为重要的影响,主要包括人防工程所处的地质条件、水文条件等,在方案设计时也应该对这些因素进行考虑。这些因素的了解是否全面和正确会直接关系到开坑的深度以及稳定性等各个方面的内容。由于开挖深度的不同各个土层的情况也会有很大不同,需要对土层情况全面的掌握。总之,在进行土钉支护施工之前应该进行全面的调查与分析,选用比较合适的土钉墙支护设计方案,以保证人防工程深基坑开挖安全、经济、周期短,保证使用的质量和效益。
第二,施工的工艺以及次序也是关系到施工质量的重要因素。土钉支护要想在人防工程深基坑施工中取得良好的支撑效果便应该严格注意和正确遵守施工工艺和施工次序。另外,在施工中应该严格按照施工图纸的设计进行,不得对各项参数进行随意更改。基坑开挖线的设置应该按照基坑四周的地面排水沟尺寸进行事先计算和事先设计,根据计算结果确定开挖线并且做好标记。
第三,开挖作业的质量也极为关键。土钉防护应该做到分层开挖和分层支护。做到边开挖边支护。具体的操作步骤为前一层土钉完成注浆之后保持一段时间才可以进行下一层的施工作业,一般情况下应该是在前一层土钉完成注浆之后的一天以上才可以继续施工,具体时间也可以根据具体情况而定。
土方开挖和支护施工需要密切配合相互协调,使开挖进程更加科学,形成循环作业。土方的开挖也要遵循一定的原则和规范,一般是因地制宜的分段作业。通常情况下,一般作业段长度应控制在10 m以内,开挖时也应该严格地遵循分层方法,严禁超挖,达到控制土体的初始位移【2】。
开挖之后,土体的暴露时间不应该过长,为了尽可能的缩短坡土体的裸露时间应该及时的浇筑混凝土覆盖。通常情况下,土钉墙固结可以达到足够强度所需要的时间一般是七天左右,但是具体情况还跟气候、土质等因素密切相关。等土钉墙完全固結之后即可进行下一层土体的开挖。为了保证边坡修整质量应该采用人工施工。这种工艺流程的设计一方面是为了增加混凝土面层与土体的粘聚力,确保挂网及喷砼的质量保持整个土墙的稳定性。另一方面是为了保持了坡面平整。
安装土钉也是一个重要环节。使用冲击钻成孔是土钉安装之前必不可少的环节。人防工程中如果采用的是钻孔注浆土钉,首先应该在注浆钢管要设置注浆口,并在注浆口的附近焊接角钢支架,以减少地基土进入注浆管内及注浆土钉有足够的直径,同时要保持一定的倾斜度【3】;
另外,由于钢管击入过程中的用力会不可避免地对地基土产生冲击力将其挤入注浆钢管内。注浆质量在这种情况下会受到影响,因此为了建筑效果应该首先对钢管实施清孔以确保土钉的注浆质量。在钢筋的铺设中也有很多施工的注意事项,首先应该注意将钢筋拉直,钢筋网片按照设计要求绑扎连接【4】。钢筋网的长度应该进行事先计算,其长度及相临搭接接头错开长度符合规范要求。不能满足规范要求的严禁使用,而是必须必须用焊接的方法进行处理。焊缝长度也不得随意为之而是要严格符合规范要求。搭接钢筋是整个钢筋网中极为重要的组成部分,钢筋网与下层钢筋网要搭接其长度一般为25倍钢筋直径,钢筋网宜在喷射一层混凝土后铺设,钢筋与坡面的间距宜大于20 mm,钢筋网与土钉锚固装置要连接牢固,喷射混凝土时钢筋才能不晃动【5】。钢筋网检查合格后要及时进行隐蔽验收以备日后使用。
在人防工程的施工建设中,深基坑的施工是一项重要内容,也涉及到很多安全问题,在施工过程中应该密切注意安全问题。因此,相关人员应该全面和及时的掌握开挖及支护施工整个过程中边坡的动态变化,及时发现其中所存在的问题并且认真解决。尤其是对支护施工过程的基坑监测药进行严密的监测,将所获得的信息进行及时加工与整理,通过修改设计反馈到施工工作中去并且加以执行,以指导施工正常进行。
结语
人防工程深基坑基坑施工中所遇到的问题较多。此类工程中应该针对施工中遇到的不同的工况和地质条件进行分析与综合,以选择合适的基坑支护形式。如各种排桩、水泥土墙、地下连续墙、土钉墙等。作为一种最近几年发展起来的用于土体开挖和边坡稳定的一种新型挡土结构,土钉支护这一施工方法具有其独特优点,但也有其施工难点。深基坑在开挖及支护的整个施工过程中会遇到很多突发情况,常常处于动态变化之中,对于其情况的把握有一定难度。因此,土钉墙支护技术也要不断地发展和进步,这样才能发挥其应有作用。
【参考文献】
[1]刘双,孙珊珊. 深基坑支护工程中土钉支护技术探讨[J].科技资讯,2010,(08).
[2]卢德强. 土钉墙支护技术在深基坑工程中的应用[J].中国新技术新产品,2011,(18).
[3]林志毅. 土钉墙支护技术及在深基坑工程中的应用[J].建筑与工程,2009,(03).
[4]鞠恒进. 浅谈人防地下街基坑边坡土钉支护技术的应用[J].山西建筑,2010,(28).
[5]谭正清,夏念恩. 土钉墙支护技术在深基坑工程中的应用概论[J]. 河南建材,2011,(04).
【关键词】人防工程;深基坑;土钉支护;技术分析
【 abstract 】 soil nail a custodian of the deep foundation pit of civil air defense projects is usually used in method, this method is mainly in order to improve the safety of the soil and the poor, has its unique advantages, in deep foundation pit construction has won extensive use. This paper expounds the basic characteristics of soil nailing support, analyzed the main technical points and fundamental advantages, the deep foundation pit of civil air defense projects the important role makes a detailed explanation.
【 keywords 】 of civil air defense projects; Deep foundation pit; Soil nailing support; Technical analysis
中图分类号:TD3文献标识码:A文章编号:
前言
为确保人防建筑物的稳定性和可适用性,深基坑的开挖越来越多。深基坑支护技术成为保证保证人防工程施工质量的关键,也成为提高人防工程质量、效率及施工的安全性的重要基础性施工方法。人防工程建设中经常会遇到深基坑,应对这种情况的主要方法是在深基坑中采用土钉支护技术。采用土钉墙支护的优点主要表现在工期短,结构轻型,所使用材料造价低,施工操作方便快捷等方面【1】。土钉支护由于从地面实施了分层成孔、插筋、注浆支护等技术措施,因此在人防工程的深基坑中发挥了较好的作用,保持了稳定性以及工程质量。因为这些技术较好的使土钉与土体形成复合体,提高了边坡的稳定性和承载能力,有效防止边坡突然坍方。
人防工程深基坑中土钉支护的相关技术探讨
在人防工程的深基坑施工中,土钉墙使用的主要材料是钢筋。土钉墙的主要目的是要增加边坡的稳定型,这种稳定性的实现主要是依靠土与加筋件之间所产生的强大的废接力。在人防工程的深基这种废接力会使坑中土体拉结成整体,加之施工过程中的混凝土喷射会使边坡稳定性得以很大提高。土钉支护的施工方式较为多样,具体的施工方法应该按照深基坑的具体情况选择。土钉按照施工方法的不同,可分为钻孔注浆型土钉、打入型土钉和射入型土钉三类。这三种方式中适用范围为广泛和使用频率最高的为钻孔注浆型土钉。钻孔注浆型土钉的支护结构主要是由喷射混凝土、注浆铺杆和钢筋网三部分组成的,这三部分联合作用所提供的支撑力对边坡起到一定的固定作用。此技术在人防工程深基坑中的土钉支护支护不但包括一般的土层,更为重要的是针对一些特殊的土地状况,比如流砂、软土、厚杂填土、强膨胀土和砂砾石等不良地层。
土钉支护在人防工程中深基坑中的具体应用
首先,土钉支护在解决人防工程深基坑中所出现的问题发挥了重要的作用,极为有效的解决了深基坑边坡的稳定性以及强度等严重影响到工程质量的关键问题,但是如何使土钉支护技术更加有效与科学的发挥作用还应该是相关人员进行探讨的重要问题。在工程开始之前应该进行的一项主要工作是分析与综合人防工程中深基坑的具体情况,选择合适的土钉墙支护设计方案。另外,还有一种客观因素对其产生了尤为重要的影响,主要包括人防工程所处的地质条件、水文条件等,在方案设计时也应该对这些因素进行考虑。这些因素的了解是否全面和正确会直接关系到开坑的深度以及稳定性等各个方面的内容。由于开挖深度的不同各个土层的情况也会有很大不同,需要对土层情况全面的掌握。总之,在进行土钉支护施工之前应该进行全面的调查与分析,选用比较合适的土钉墙支护设计方案,以保证人防工程深基坑开挖安全、经济、周期短,保证使用的质量和效益。
第二,施工的工艺以及次序也是关系到施工质量的重要因素。土钉支护要想在人防工程深基坑施工中取得良好的支撑效果便应该严格注意和正确遵守施工工艺和施工次序。另外,在施工中应该严格按照施工图纸的设计进行,不得对各项参数进行随意更改。基坑开挖线的设置应该按照基坑四周的地面排水沟尺寸进行事先计算和事先设计,根据计算结果确定开挖线并且做好标记。
第三,开挖作业的质量也极为关键。土钉防护应该做到分层开挖和分层支护。做到边开挖边支护。具体的操作步骤为前一层土钉完成注浆之后保持一段时间才可以进行下一层的施工作业,一般情况下应该是在前一层土钉完成注浆之后的一天以上才可以继续施工,具体时间也可以根据具体情况而定。
土方开挖和支护施工需要密切配合相互协调,使开挖进程更加科学,形成循环作业。土方的开挖也要遵循一定的原则和规范,一般是因地制宜的分段作业。通常情况下,一般作业段长度应控制在10 m以内,开挖时也应该严格地遵循分层方法,严禁超挖,达到控制土体的初始位移【2】。
开挖之后,土体的暴露时间不应该过长,为了尽可能的缩短坡土体的裸露时间应该及时的浇筑混凝土覆盖。通常情况下,土钉墙固结可以达到足够强度所需要的时间一般是七天左右,但是具体情况还跟气候、土质等因素密切相关。等土钉墙完全固結之后即可进行下一层土体的开挖。为了保证边坡修整质量应该采用人工施工。这种工艺流程的设计一方面是为了增加混凝土面层与土体的粘聚力,确保挂网及喷砼的质量保持整个土墙的稳定性。另一方面是为了保持了坡面平整。
安装土钉也是一个重要环节。使用冲击钻成孔是土钉安装之前必不可少的环节。人防工程中如果采用的是钻孔注浆土钉,首先应该在注浆钢管要设置注浆口,并在注浆口的附近焊接角钢支架,以减少地基土进入注浆管内及注浆土钉有足够的直径,同时要保持一定的倾斜度【3】;
另外,由于钢管击入过程中的用力会不可避免地对地基土产生冲击力将其挤入注浆钢管内。注浆质量在这种情况下会受到影响,因此为了建筑效果应该首先对钢管实施清孔以确保土钉的注浆质量。在钢筋的铺设中也有很多施工的注意事项,首先应该注意将钢筋拉直,钢筋网片按照设计要求绑扎连接【4】。钢筋网的长度应该进行事先计算,其长度及相临搭接接头错开长度符合规范要求。不能满足规范要求的严禁使用,而是必须必须用焊接的方法进行处理。焊缝长度也不得随意为之而是要严格符合规范要求。搭接钢筋是整个钢筋网中极为重要的组成部分,钢筋网与下层钢筋网要搭接其长度一般为25倍钢筋直径,钢筋网宜在喷射一层混凝土后铺设,钢筋与坡面的间距宜大于20 mm,钢筋网与土钉锚固装置要连接牢固,喷射混凝土时钢筋才能不晃动【5】。钢筋网检查合格后要及时进行隐蔽验收以备日后使用。
在人防工程的施工建设中,深基坑的施工是一项重要内容,也涉及到很多安全问题,在施工过程中应该密切注意安全问题。因此,相关人员应该全面和及时的掌握开挖及支护施工整个过程中边坡的动态变化,及时发现其中所存在的问题并且认真解决。尤其是对支护施工过程的基坑监测药进行严密的监测,将所获得的信息进行及时加工与整理,通过修改设计反馈到施工工作中去并且加以执行,以指导施工正常进行。
结语
人防工程深基坑基坑施工中所遇到的问题较多。此类工程中应该针对施工中遇到的不同的工况和地质条件进行分析与综合,以选择合适的基坑支护形式。如各种排桩、水泥土墙、地下连续墙、土钉墙等。作为一种最近几年发展起来的用于土体开挖和边坡稳定的一种新型挡土结构,土钉支护这一施工方法具有其独特优点,但也有其施工难点。深基坑在开挖及支护的整个施工过程中会遇到很多突发情况,常常处于动态变化之中,对于其情况的把握有一定难度。因此,土钉墙支护技术也要不断地发展和进步,这样才能发挥其应有作用。
【参考文献】
[1]刘双,孙珊珊. 深基坑支护工程中土钉支护技术探讨[J].科技资讯,2010,(08).
[2]卢德强. 土钉墙支护技术在深基坑工程中的应用[J].中国新技术新产品,2011,(18).
[3]林志毅. 土钉墙支护技术及在深基坑工程中的应用[J].建筑与工程,2009,(03).
[4]鞠恒进. 浅谈人防地下街基坑边坡土钉支护技术的应用[J].山西建筑,2010,(28).
[5]谭正清,夏念恩. 土钉墙支护技术在深基坑工程中的应用概论[J]. 河南建材,2011,(04).