邯郸西石门铁矿1250kW主井提升机旧电控系统使用到1995年,出现过严重的事故──溜井,严重影响正常生产,造成很大的经济损失,不能保证生产任务按计划完成。对于矿山来说,提升机是至关重要的设备,绝不允许其带病工作,故从1996年开始酝酿本项目,进行技术改造,重新设计制
Handan Shi Shimen iron 1250kW main shaft hoist old electronic control system used to 1995, there have been serious accidents ─ ─ Chute, seriously affecting the normal production, causing great economic losses, can not guarantee the production tasks completed as planned. For mines, hoist is a vital equipment, will not allow its work with sick, it began brewing in 1996 the project, technological innovation, redesign