从去年第四季度末开始,我部各设計院根据部的指示开展了一次群众性的設計質量检查运动。这次質量检查,各院的做法大体相同;但又各有特点。一般地說,都是院长亲自掛帅,深入發动群众,虛实結合,专人检查和群众检查相結合,院內检查和現場检查相結合。通过这次检查,要求达到“改进質量、提高思想、建立制度”三丰收。各院检查的重点,都是放在厂房結构上;其它各部分只作配合检查。检查的步驟都是按施工緩急分批进行的;首先检查已建成尚未投入生产的或正在施工和即将施工的工程,然后检查今年开工的其它工程。截至二月庄止,大多数設計院的检查工作已告一段落。对检查出來的問題,也正在分别輕重緩急,研究修改設計和提高設計質量的措施。有些設計院並已派出
Starting from the end of the fourth quarter of last year, the design institutes of our ministry carried out a mass design quality inspection campaign in accordance with the directives of the Ministry. In this quality inspection, the practice of the hospitals is generally the same; but each has its own characteristics. Generally speaking, they are personally instructed by the Dean, intensively mobilize the masses, integrate the actual situation and the actual situation, combine the inspection of individuals with the inspection of the masses, and combine the inspection in the hospital with the on-site inspection. Through this inspection, it is required to achieve the three good harvests of “improving quality, raising ideas, and establishing a system”. The focus of all hospital inspections is on the structure of the factory; all other parts are only checked for cooperation. The inspection steps are carried out in batches according to the priority of construction; first, check the projects that have not yet been put into production, or are under construction and are about to be completed, and then check the other projects that are started this year. As of February, the inspection work of most design institutes has come to an end. The issues that have been checked out are also being prioritized, and the measures for modifying the design and improving the quality of design are being studied. Some design institutes have already dispatched