论文部分内容阅读
2006年8月安徽开发矿业有限公司试验型镜铁矿选厂建成投产,设计年处理量60万t,为后续建设750万t/a大型选厂提供了技术数据。磨矿设备使用的是4台φ2700mm×3600mm球磨机,分为2个
In August 2006, the trial-type mirror iron ore processing plant of Anhui Development Mining Co., Ltd. was completed and put into production. The designed annual processing capacity was 600,000 tons, which provided technical data for the subsequent construction of 7.5 million t / a large-sized dressing plant. Grinding equipment is used 4 φ2700mm × 3600mm ball mill, divided into two