郑西铁路客运专线CRTSⅡ双块式无砟轨道施工中,采用旭普林机械和轨排两种作业方法。通过对两种施工方法的总结和比较,阐述了各自特点和在不同施工作业环境下的适用性,简要说明了施工过程中技术改进措施,提出今后同类施工组织和技术管理方面的建议。
In the construction of CRTS Ⅱ double-block ballastless track of Zheng-Xi Railway Passenger Dedicated Line, two kinds of operation methods of Asperbun machine and rail row are adopted. Through the summary and comparison of the two construction methods, the characteristics and applicability of the two construction methods are expounded, the technical improvement measures in the construction process are briefly described, and the suggestions on the similar construction organization and technical management in the future are proposed.