“两纵十横、六河连通、覆盖全省”的山西大水网是山西省委、省政府确定的“十二五”重大基础设施工程,也是水利部“江河湖库水系连通”的试点工程。大水网4大骨干工程规划总投资190亿元,隧洞总长630余km,工程战线之长、范围之广、技术难度之复杂,在山西省水利建设史上前所未有。2013年,按照省委、省政府对大水网建设“保质量、保安全、保廉政”的总要求,省水利厅多措并举, “Two vertical and ten horizontal, six rivers connected, covering the province, ” Shanxi Dashu network is Shanxi provincial Party committee and government to determine the “Twelve-Five ” major infrastructure projects, but also the Ministry of Water Resources Water system connectivity “pilot project. The total investment of 19 key projects in the 4 key projects of Dashu Network is 19 billion km. The total length of the tunnel is more than 630 km. The project has a long line and a wide range of technical difficulties. It is unprecedented in the history of water conservancy construction in Shanxi Province. In 2013, in accordance with the general requirements of the provincial party committee and the provincial government for the construction of a large-scale water network, ”ensuring the quality, ensuring the safety and ensuring the integrity of the economy"
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
随着科技的发展,各行业当中的机械化水平得到了很大的提升,在减少劳动力消耗的同时,实现了高效生产的目标,特别是在农业方面,机械化的发展使得乡镇地区缺乏劳动力的问题得到
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊