摘要:基坑围护工程是指80年代末,上海等城市建设出现的一种新的趋势。基坑围护工程利用开发地下空间,建设多层地下室、地下通道、地下商业街等等各种地下建筑。基坑围护体系,是一个土体、支护结构相互共同作用的有机体,由于周围建筑物及地下管道等因素的制约,对支护结构的安全性有了更高的要求。不仅要能保证基坑的稳定性及坑内作业的安全、方便,而且要使坑底和坑外的土体位移控制在一定范围内,确保邻近建筑物及市政设施正常使用。
关键词:基坑维护工程渗漏技术
Abstract: pit enclosure engineering is to point to 80 s, Shanghai city construction of appeared a new trend. Pit supporting development of underground space project, the construction of multilayer basement, underground passage, underground commercial street and so on all sorts of underground structures. Pit supporting system, and is a soil, supporting structure of the joint action of each other organisms, due to the surrounding buildings and underground pipeline etc factors, the safety of supporting structure has higher requirements. Not only can guarantee the stability of the foundation pit and the safety of the operation, convenient, and should make the den and pit of the soil displacement control within a certain range, ensure adjacent building and municipal facilities of normal use.
Keywords: foundation pit engineering maintenance leakage technology
中图分类号: TV551.4文献标识码:A 文章编号:
基坑围护工程,能够有效地利用地下空间,缓解大城市用地紧张的状况,可是基坑围护工程的安全也是一个问题。在基坑围护工程中,经常出现渗水、漏水的情况,严重地影响了基坑围护工程的安全。因此,研究基坑围护工程渗漏水处理方法,对围护基坑围护工程的安全性有很重要的意义。
一 基坑围护工程渗漏水的原因
在基坑围护工程中,使用的结构大都都是混凝土结构。在基坑围护工程中,对混凝土结构的要求更加地严格。由于地下室结构中根据结构构造和应用的要求,地下室墙板和顶板不仅浇筑的体积大,而且一般要求连续浇筑一次成型,这就为混凝土的裂缝控制提出了较高的要求。在水泥水化过程中,会释放出大量水化热,使混凝土内部的温度升高,造成较大的温差,而在达到温度峰值后的温降过程较为缓慢,这种温度的不均匀性将导致混凝土内部和边界的温度导致不利的内应力,其次,在混凝土受约束较强的情况下,在温降过程中产生的体积变化将引起附加应力。以上两种的应力相互叠加后,便产生了混凝土内部的早期应力,而混凝土早期抗拉强度很小,一旦内应力超过混凝土早期抗拉强度,就会产生裂缝,地下室结构就会出现渗漏水。这就说明控制混凝土裂缝是防止地下混凝土结构渗漏水的关键。而混凝土裂缝控制是一项系统工程,往往是各种因素的综合,它涉及到结构设计、材料的选用、施工工艺及气候条件的限制。
从以上可以看出,基坑围护工程渗漏水的原因主要是由混凝土结构的裂缝引起的,混凝土的漏水情况大致分为以下几种。一是指蜂窝麻面的渗水现象,蜂窝麻面是由于工程人员在施工时,对混凝土漏振或者对混凝土振动的时间不够。蜂窝麻面在混凝土结构中成片成批存在,因此渗漏水也是成批成片的存在;二是指混凝土伸缩缝和沉降缝的渗漏水现象。这种情况下发生在大体积的混凝土或者混凝土结构物比较长、结构物高低相差较大的工程中,在这些结构中,一般都需要设置伸缩缝或者沉降缝,而这些设有伸缩缝和沉降缝的地方,在施工时往往因为各种原因不能保证它们的质量,所以导致在伸缩缝和沉降缝的部位经常发生渗漏水的情况。三是指当新旧的混凝土接缝时发生的渗漏水情况,有时工程人员需要在原有混凝土结构上继续浇筑新的混凝土,如果处理不得当,在浇筑新的混凝土时,没有对旧的混凝土进行凿毛处理或者凿毛之后没有进行彻底地清理,都可能导致新旧混凝土之间出现一道道很细的缝隙,这些缝隙很容易出现渗漏水的情况,因此要特别加以注意,这也是混凝土结构经常出现渗漏水的原因。
二 基坑围护工程中处理渗漏的技术分析
对于导致基坑围护工程出现渗漏水的不同原因,我们可以采取不同的渗漏处理方法。具体的可以分为以下几种。
1 化学灌浆法
当基坑围护工程出現的漏水情况为一条线漏水时,可以采用化学灌浆法。它是指用一种化学灌浆料和快速凝结水泥以及无收缩水泥砂浆一起配合使用,用来封堵线形渗漏的部位,从而达到处理渗漏的效果。我们常见的化学灌浆料有LW水溶性聚氨酯、HW水溶性聚氨酯和低粘度环氧树脂。这些不同的化学灌浆材料对粘结强度、抗压强度和遇水膨胀率的技术指标要求都不同,施工人员在施工时,一定要按照这些化学灌浆材料的技术指标严格施工,才能达到预期的效果。在采用化学灌浆法处理基坑围护工程时,一般是指遇到渗水情况比较严重的情况。
对这种渗漏水比较严重的部位采取化学灌浆法的一般处理方法是,首先在漏水的缝隙处凿出一道“V”型槽,然后用掺有速凝剂的水泥净浆埋设灌浆的嘴,用聚合物水泥砂浆封堵缝隙。在混凝土的基层面要用刚洗刷将表面的浮灰清理干净,然后再用清水进行清理。如果混凝土的表面没有浮水,那么就要喷涂5厘米厚的PCCM。在喷涂过后5天,再用LW水溶性聚氨酯浆液进行化学灌浆。在灌浆时,灌浆压力要控制在一定的范围,一般灌浆压力为0.3Mpa,当灌浆压力过大时,可能会导致塑料管爆裂。
2 嵌缝堵漏法
当使用这种方法时,说明混凝土出现的漏水现象还比较轻,只是出现一些表面映水的现象,但是长此下去,混凝土会出现大面积的水迹,并会导致基坑围护工程地下积水,影响整个工程的美观和使用年限。
在使用这种方法时,一般的步骤也是首先在沿着混凝土渗水的缝隙处凿出一个“V”型槽,将槽内的杂物用清水清理干净,然后在清洁、干燥的混凝土缝隙处均匀地涂刷SR塑料止水材料专用的基液。在基液未干之前,要嵌填SR塑性止水材料。然后进行修理和保护,用小刮刀等工具在密封胶表面未干之前将表面修理平整。一定要在经过嵌缝的缝面上撒上水,保持缝面的潮湿。然后将配置好的PCCM砂浆用刮刀嵌入缝中,用抹刀将其抹平。等PCCM砂浆充分凝结之后,要保持经施工后的混凝土表面的潮湿,这样养护3到5天。然后再按一定的比例配置HK—964的增厚型环氧涂料,进行反复的搅拌,然后均匀地涂在施工后的混凝土的表面。在干燥和平整的混凝土缝隙表面进行刷964弹性涂料工作时,要按照一刷压一刷的操作来进行,这样可以有效地防止有些地方漏刷涂料的情况。
3 封堵堵漏法
运用封堵堵漏方法处理基坑渗漏水时,主要是指用来快速封堵在水下或者地下出现的混凝土空隙、孔洞和裂缝。这时的操作要比起上两种操作要难得多,堵水的效果也没前两种明显。在使用这种方法时,可以运用的材料有快速封堵剂,或者成为PBM聚合物,这种材料粘结强度高,抗拉强度和抗折强度、抗压强度都很高,能满足混凝土对聚合物水下性能的需求。
在使用这种方法时,首先得清理干净混凝土基底,若是出现涌水的情况,要首先在漏水的地方凿一个直径为80到100毫米、深为50到80毫米的坑,在坑中安插一根导水管,进行排水。然后抹上聚合物混凝土,待达到一定的强度之后,再用聚合物砂浆将坑用力堵上。在有涌水的堵漏过程中,钢管一定要在混凝土或砂浆硬化之前进行转动,如果不这样做,钢管就会在砂浆或混凝土硬化后无法拿出来,从而造成必须返工的现象。
总结:
基坑围护工程出现渗漏水情况将大大影响基坑工程的实用性和安全性,因此,必须对基坑围护工程的质量进行严格地要求。当基坑围护工程出现渗漏水的情况时,相关人员要及时地采取措施,制止基坑工程渗漏水,保证基坑工程的安全。基坑工程中主要采用的是混凝土结构,因此,导致基坑工程出现渗漏水的主要原因是混凝土出现渗漏水的现象。在处理这类渗漏水事故时,我们可以采取化学灌浆法、嵌缝堵漏法和封堵堵漏法。相关人员必须根据渗漏水的具体情况和导致基坑围护工程出现渗漏水的具体原因,选择使用相对的合适的渗漏处理方法,才能达到处理渗漏的具体效果。
参考文献:
[1] 刘新安. 压密注浆法处理基坑渗漏实例[J]. 河南建材, 2007(8).
[2] 龚志超,张志平. 基坑渗漏应急治理措施[J]. 广西质量监督导报,2007(10).
[3] 谭世俊. 明挖地铁车站基坑渗漏水治理浅析[J]. 山西建筑, 2008(9).
[4] 张正. 某越江隧道浦西工作井基坑渗漏及抢险处理技术[J]. 建筑施工, 2010(3).
[5] 汪建钢, 单永华. 浅谈深基坑渗漏封堵[J]. 山西建筑, 2010(6).
关键词:基坑维护工程渗漏技术
Abstract: pit enclosure engineering is to point to 80 s, Shanghai city construction of appeared a new trend. Pit supporting development of underground space project, the construction of multilayer basement, underground passage, underground commercial street and so on all sorts of underground structures. Pit supporting system, and is a soil, supporting structure of the joint action of each other organisms, due to the surrounding buildings and underground pipeline etc factors, the safety of supporting structure has higher requirements. Not only can guarantee the stability of the foundation pit and the safety of the operation, convenient, and should make the den and pit of the soil displacement control within a certain range, ensure adjacent building and municipal facilities of normal use.
Keywords: foundation pit engineering maintenance leakage technology
中图分类号: TV551.4文献标识码:A 文章编号:
基坑围护工程,能够有效地利用地下空间,缓解大城市用地紧张的状况,可是基坑围护工程的安全也是一个问题。在基坑围护工程中,经常出现渗水、漏水的情况,严重地影响了基坑围护工程的安全。因此,研究基坑围护工程渗漏水处理方法,对围护基坑围护工程的安全性有很重要的意义。
一 基坑围护工程渗漏水的原因
在基坑围护工程中,使用的结构大都都是混凝土结构。在基坑围护工程中,对混凝土结构的要求更加地严格。由于地下室结构中根据结构构造和应用的要求,地下室墙板和顶板不仅浇筑的体积大,而且一般要求连续浇筑一次成型,这就为混凝土的裂缝控制提出了较高的要求。在水泥水化过程中,会释放出大量水化热,使混凝土内部的温度升高,造成较大的温差,而在达到温度峰值后的温降过程较为缓慢,这种温度的不均匀性将导致混凝土内部和边界的温度导致不利的内应力,其次,在混凝土受约束较强的情况下,在温降过程中产生的体积变化将引起附加应力。以上两种的应力相互叠加后,便产生了混凝土内部的早期应力,而混凝土早期抗拉强度很小,一旦内应力超过混凝土早期抗拉强度,就会产生裂缝,地下室结构就会出现渗漏水。这就说明控制混凝土裂缝是防止地下混凝土结构渗漏水的关键。而混凝土裂缝控制是一项系统工程,往往是各种因素的综合,它涉及到结构设计、材料的选用、施工工艺及气候条件的限制。
从以上可以看出,基坑围护工程渗漏水的原因主要是由混凝土结构的裂缝引起的,混凝土的漏水情况大致分为以下几种。一是指蜂窝麻面的渗水现象,蜂窝麻面是由于工程人员在施工时,对混凝土漏振或者对混凝土振动的时间不够。蜂窝麻面在混凝土结构中成片成批存在,因此渗漏水也是成批成片的存在;二是指混凝土伸缩缝和沉降缝的渗漏水现象。这种情况下发生在大体积的混凝土或者混凝土结构物比较长、结构物高低相差较大的工程中,在这些结构中,一般都需要设置伸缩缝或者沉降缝,而这些设有伸缩缝和沉降缝的地方,在施工时往往因为各种原因不能保证它们的质量,所以导致在伸缩缝和沉降缝的部位经常发生渗漏水的情况。三是指当新旧的混凝土接缝时发生的渗漏水情况,有时工程人员需要在原有混凝土结构上继续浇筑新的混凝土,如果处理不得当,在浇筑新的混凝土时,没有对旧的混凝土进行凿毛处理或者凿毛之后没有进行彻底地清理,都可能导致新旧混凝土之间出现一道道很细的缝隙,这些缝隙很容易出现渗漏水的情况,因此要特别加以注意,这也是混凝土结构经常出现渗漏水的原因。
二 基坑围护工程中处理渗漏的技术分析
对于导致基坑围护工程出现渗漏水的不同原因,我们可以采取不同的渗漏处理方法。具体的可以分为以下几种。
1 化学灌浆法
当基坑围护工程出現的漏水情况为一条线漏水时,可以采用化学灌浆法。它是指用一种化学灌浆料和快速凝结水泥以及无收缩水泥砂浆一起配合使用,用来封堵线形渗漏的部位,从而达到处理渗漏的效果。我们常见的化学灌浆料有LW水溶性聚氨酯、HW水溶性聚氨酯和低粘度环氧树脂。这些不同的化学灌浆材料对粘结强度、抗压强度和遇水膨胀率的技术指标要求都不同,施工人员在施工时,一定要按照这些化学灌浆材料的技术指标严格施工,才能达到预期的效果。在采用化学灌浆法处理基坑围护工程时,一般是指遇到渗水情况比较严重的情况。
对这种渗漏水比较严重的部位采取化学灌浆法的一般处理方法是,首先在漏水的缝隙处凿出一道“V”型槽,然后用掺有速凝剂的水泥净浆埋设灌浆的嘴,用聚合物水泥砂浆封堵缝隙。在混凝土的基层面要用刚洗刷将表面的浮灰清理干净,然后再用清水进行清理。如果混凝土的表面没有浮水,那么就要喷涂5厘米厚的PCCM。在喷涂过后5天,再用LW水溶性聚氨酯浆液进行化学灌浆。在灌浆时,灌浆压力要控制在一定的范围,一般灌浆压力为0.3Mpa,当灌浆压力过大时,可能会导致塑料管爆裂。
2 嵌缝堵漏法
当使用这种方法时,说明混凝土出现的漏水现象还比较轻,只是出现一些表面映水的现象,但是长此下去,混凝土会出现大面积的水迹,并会导致基坑围护工程地下积水,影响整个工程的美观和使用年限。
在使用这种方法时,一般的步骤也是首先在沿着混凝土渗水的缝隙处凿出一个“V”型槽,将槽内的杂物用清水清理干净,然后在清洁、干燥的混凝土缝隙处均匀地涂刷SR塑料止水材料专用的基液。在基液未干之前,要嵌填SR塑性止水材料。然后进行修理和保护,用小刮刀等工具在密封胶表面未干之前将表面修理平整。一定要在经过嵌缝的缝面上撒上水,保持缝面的潮湿。然后将配置好的PCCM砂浆用刮刀嵌入缝中,用抹刀将其抹平。等PCCM砂浆充分凝结之后,要保持经施工后的混凝土表面的潮湿,这样养护3到5天。然后再按一定的比例配置HK—964的增厚型环氧涂料,进行反复的搅拌,然后均匀地涂在施工后的混凝土的表面。在干燥和平整的混凝土缝隙表面进行刷964弹性涂料工作时,要按照一刷压一刷的操作来进行,这样可以有效地防止有些地方漏刷涂料的情况。
3 封堵堵漏法
运用封堵堵漏方法处理基坑渗漏水时,主要是指用来快速封堵在水下或者地下出现的混凝土空隙、孔洞和裂缝。这时的操作要比起上两种操作要难得多,堵水的效果也没前两种明显。在使用这种方法时,可以运用的材料有快速封堵剂,或者成为PBM聚合物,这种材料粘结强度高,抗拉强度和抗折强度、抗压强度都很高,能满足混凝土对聚合物水下性能的需求。
在使用这种方法时,首先得清理干净混凝土基底,若是出现涌水的情况,要首先在漏水的地方凿一个直径为80到100毫米、深为50到80毫米的坑,在坑中安插一根导水管,进行排水。然后抹上聚合物混凝土,待达到一定的强度之后,再用聚合物砂浆将坑用力堵上。在有涌水的堵漏过程中,钢管一定要在混凝土或砂浆硬化之前进行转动,如果不这样做,钢管就会在砂浆或混凝土硬化后无法拿出来,从而造成必须返工的现象。
总结:
基坑围护工程出现渗漏水情况将大大影响基坑工程的实用性和安全性,因此,必须对基坑围护工程的质量进行严格地要求。当基坑围护工程出现渗漏水的情况时,相关人员要及时地采取措施,制止基坑工程渗漏水,保证基坑工程的安全。基坑工程中主要采用的是混凝土结构,因此,导致基坑工程出现渗漏水的主要原因是混凝土出现渗漏水的现象。在处理这类渗漏水事故时,我们可以采取化学灌浆法、嵌缝堵漏法和封堵堵漏法。相关人员必须根据渗漏水的具体情况和导致基坑围护工程出现渗漏水的具体原因,选择使用相对的合适的渗漏处理方法,才能达到处理渗漏的具体效果。
参考文献:
[1] 刘新安. 压密注浆法处理基坑渗漏实例[J]. 河南建材, 2007(8).
[2] 龚志超,张志平. 基坑渗漏应急治理措施[J]. 广西质量监督导报,2007(10).
[3] 谭世俊. 明挖地铁车站基坑渗漏水治理浅析[J]. 山西建筑, 2008(9).
[4] 张正. 某越江隧道浦西工作井基坑渗漏及抢险处理技术[J]. 建筑施工, 2010(3).