针对陆浑水库水电站装机容量确定的问题,充分考虑水库用水需求及电站的运行规则建立了陆浑水库水电站的调节计算模型,采用动态规划算法,对陆浑水库进行长系列的仿真调节计算,通过对不同方案进行对比分析,从而得出最优的装机方案。该模型与计算方法也可为类似水电站装机确定提供一定的参考。
Aiming at the problem of determining the installed capacity of Lu Hun Reservoir Hydropower Station, the adjustment calculation model of Lu Hun Reservoir Hydropower Station was fully considered considering the demand of reservoir water and the operating rules of the hydropower station. The dynamic programming algorithm was adopted to simulate the long series of Lu Hun Reservoir. Comparative analysis of different programs to arrive at the optimal installation program. The model and calculation method can also provide some reference for similar hydropower station installed capacity determination.