瑞丽江一级水电站位于缅甸北部掸邦境内紧邻中缅边境的瑞丽江干流上,电站总装机容量60万千瓦,单机容量10万千瓦,保证出力17,4万千瓦,设计年平均发电量40,33亿千瓦时,年利用6722小时,首台机组于2008年9月投产发电,2009年4月,6台机组全部投产运行,工程总投资约32亿元人民币。工程建设快、质量好、安全零事故。并且在投产当年即创造利润。整个项目创下了国际国内水电建设多项新纪录。被缅方喻为“缅甸的三峡工程”。该项目由中国华能集团公司所属华能澜沧江水电有限公司控股的云南联合电力开发有限公司(占股80%,以下简称联合电力公司)与缅甸联邦电力一部水电实施司(占股20%)组
The Ruilijiang First Class Hydropower Station is located on the mainstream of the Ruili River directly adjacent to the Sino-Burmese border in Shan State in the northern part of Myanmar. The total installed capacity of the station is 600,000 kilowatts, with a stand-alone capacity of 100,000 kilowatts and a guaranteed output of 17,400 kilowatts, with an average annual generating capacity of 40, 3.3 billion kwh, 6722 hours of annual use, the first unit commissioned in September 2008 power generation, in April 2009, all 6 units put into operation, the project a total investment of about 3.2 billion yuan. Construction projects fast, good quality and zero accidents. And that year to create profits. The entire project set a new record in international and domestic hydropower construction. Burma is referred to as “the Three Gorges Project in Myanmar.” The project is jointly controlled by Yunnan United Power Development Co., Ltd. (80% shareholding, hereinafter referred to as United Power Company) controlled by Huaneng Lancangjiang Hydropower Co., Ltd., a subsidiary of China Huaneng Group, and a unit of 20%