联系单位:北京市市政工程设计研究总院有限公司项目内容:遵义市中桥水库水厂工程近期(2015年)建设规模15万m3/d,远期(2030年)建设规模30万m3/d。采用常规制水工艺,针对水库夏季可能受到藻类影响的问题,本工程采用预臭氧与高锰酸钾复合氧化作为预氧化措施,加氯作为辅助备用措施。从近期的水质监测数据看,仁江河干流水质较好,因此本次工程预留预臭氧土建设施,暂不安装设备。鉴于机械混合应对水量变化能力强,
Contact Unit: Beijing Municipal Engineering Design and Research Institute Co., Ltd. Project Description The construction scale of Zhongqiao Reservoir Water Works in Zunyi City in the near future (2015) is 150,000 m3 / d and the long-term (2030) construction scale is 300,000 m3 / d . The conventional water-making process is adopted. In view of the possible influence of the algae in summer in the reservoir, pre-ozone and potassium permanganate combined oxidation are used as pre-oxidation measures and chlorination as auxiliary backup measures. Judging from the recent water quality monitoring data, the water quality of the Renjiang River main stream is good. Therefore, this project reserves the pre-ozone earth construction facilities and temporarily does not install the equipment. Given the ability of mechanical mixing to respond to changes in water,