近年来,随着循环流化床锅炉技术日趋成熟,各大电厂纷纷上马大型循环流化床机组,但大型流化床锅炉的安装工期一般都很长,如何才能缩短循环流化床锅炉的安装工期一直是电建技术工作者研究探索的课题,通过对巡检司电厂循环流化床锅炉吊装技术优化的阐述,认为通过优化吊装方案,能够大幅缩短大型循环流化床锅炉的安装工期。
In recent years, with the circulating fluidized bed boiler technology matures, major power plants have launched large-scale circulating fluidized bed units, but large-scale fluidized bed boiler installation period is generally very long, how to shorten the installation of circulating fluidized bed boiler The construction period has been a subject explored by the electrician-built technical workers. Through the optimization of the lifting technology of the circulating fluidized bed boiler in the power plant of the inspection division, it is considered that the installation period of the large-scale circulating fluidized bed boiler can be drastically shortened by optimizing the lifting scheme.