论文部分内容阅读
大规模连续灌筑高水泥用量的结构混凝土可采用在英国改进过的工艺方法。当灌筑大量配筋的结构性混凝土时,该工艺解决建筑工业经常面临着要对付的水化热问题,它特别有助于灌筑底板基础。本方法考虑了不同于按照传统的方法应用在大体积混凝土坝上的情况。后
Large-scale continuous pouring of high cement content of structural concrete can be used in the UK improved process. When filling a large amount of reinforced structural concrete with concrete, the process addresses the hydration heat problems often faced by the construction industry and is particularly useful for the filling of foundations. This method takes into account the different from the traditional method applied to the mass concrete dam on the situation. Rear