特高压直流输电示范工程,容量大,可靠性指标要求高,许多设备是首次研制生产,没有运行经验,且换流变压器、换流阀、平波电抗器等换流站主设备与控制及保护系统在可靠性和运行维护等方面的要求比常规直流设备更高,因此需要从以往的常规直流输电工程中汲取经验教训。根据2000年后投运的国网公司所辖直流输电工程运行情况,对已投运的换流站进行运行分析、总结,重点研究事故的预控与设备的前期控制,讨论存在的共性问题,探讨发生问题的规律以及已运行设备的问题,为特高压和新建直流工程提供参考,将可能发生的问题在工程前期解决,以期提高中国高电压、大容量、长距离的直流输电线路的安全运行水平,充分发挥其输电能力,减少不必要的停运,缩短检修时间。
UHV DC transmission demonstration project, large capacity, high reliability requirements, many of the equipment is the first development and production, there is no operating experience, and converter transformers, converter valves, smoothing reactor converter station main equipment and control and protection System reliability and operation and maintenance requirements than conventional DC equipment higher, so the need for conventional HVDC projects from the past lessons learned. According to the operation of HVDC transmission projects under the State Grid Corporation put into operation after 2000, this paper analyzes the operation of the converter stations that have been put into operation, summarizes and focuses on the pre-control of accidents and the pre-control of equipment, discusses the common problems, Discussing the law of the occurrence of the problem and the problems of the operated equipment, providing references for UHV and DC construction, and resolving possible problems in the early stage of the project so as to improve the safe operation of China’s high-voltage, large-capacity and long-distance DC transmission lines Level, give full play to their transmission capacity, reduce unnecessary outage, shorten the maintenance time.