三峡-葛洲坝两坝联合调度综合考虑三峡双线五级船闸(目前升船机尚未启用)和葛洲坝三个船闸,根据两坝之间距离不远的特点,实行联合调度,使这段“黄金水道”尽可能畅通.根据通航约束条件和安全性要求,以及船闸调度“先到先过与重点优先相兼顾”的调度原则,引入了联合调度的数学模型,并给出了逐步最优化算法POA.模型的合理性与算法的有效性在工程中得到验证.
Three Gorges - Gezhouba two dam joint scheduling Consideration of the Three Gorges double line five locks (the current lift not yet enabled) and Gezhouba three locks, according to the characteristics of the distance between the two dams, the implementation of joint scheduling, so that this section of the “golden waterway ”As smooth as possible.According to the navigation constraints and safety requirements, and the scheduling principle of“ first arriving first and prioritizing priority ”, the mathematical model of the joint dispatching is introduced and the step-by-step optimization algorithm POA is given. The rationality of the model and the validity of the algorithm are verified in the project.