一、提前一年零二十月完成国家第一个五年计划,并按部颁标准达到国家计划的质量指标,年产量比上年实际提高90%,质量综合指标达到规定的89.20%。二、保证安全生产消灭伤亡事故、重伤事故及重大设备事故,逐步减少一般事故。三、综合成本指标比上年实际降低3.5%。四、在本年度6月及9月以前完成两种新产品试制工作。为实现上述条件采取的基本措施: 一、自3月份起采用水压机成型一部分品种,并实行流水作业法。
First, one year and 20 months in advance to complete the country’s first five-year plan, and according to the ministerial standards to meet the quality indicators of the state plan, the actual output increased 90% over the previous year, the quality of the integrated indicators reached the required 89.20%. Second, to ensure safe production to eliminate casualties, serious injuries and major equipment accidents, and gradually reduce the general accident. Third, the comprehensive cost index decreased by 3.5% over the previous year. Fourth, the completion of trial production of two new products before June and September this year. To achieve the above conditions to take the basic measures: First, since March using hydraulic press forming part of the species, and the implementation of assembly line method.