论文部分内容阅读
貴刊1963午第10期邹守簡同志的《倒虹吸灌溉涵洞設計介绍》一文对弹性地基上梁(基础梁)的計算方法作了重点的分析,为倒虹吸管的設計提供了一个示例,是十分有益的。笔者也曾参加倒虹吸管的設計工作,深感基础梁的設計对整个倒虹吸管工程的造价和运用条件都有很大的影响,因此,对基础梁的設計问题进行探討是很有必要的。本文拟就邹文中的一些問題提出个人的意見,并对1—0.3米倒虹吸管基础梁的設計作一介紹。笔者技术水平很低,錯誤的地方,请邹守簡同志和其他同志們指正。
An article entitled “Introduction of culverts for inverted siphon irrigation”, by Zou Shou-jian, No. 10, 1963, focuses on the calculation method of beams (foundation beams) on elastic foundations and provides an example for the design of inverted siphons. It is very useful of. The author also participated in the design work of inverted siphon, and deeply felt that the design of foundation beam has a great influence on the cost and application conditions of the entire inverted siphon project. Therefore, it is necessary to discuss the design of foundation beam. This article intends to put forward some personal opinions on some problems in Zou Wenzhong, and introduces the design of the 1-0.3 meter inverted siphon base beam. The author’s skill level is very low, the wrong place, please comrades Zou Shoujian and other comrades correct me.