【摘 要】 在施工企业中,加强对工程成本管理,不断降低成本,具有十分重要的意义。工程成本的降低表明企业在建筑安装施工过程中的活劳动和物化劳动的节约。企业的成本控制环节众多,一般有成本预测、成本计划、成本核算等。本文着重浅谈施工企业的成本管理中作用以及分述事前控制、事中控制和事后控制。
【关键词】 排水管道;质量;控制
【中图分类号】 TU723.3 【文献标识码】 B【文章编号】 1727-5123(2009)03-029-01
Analysis of Construction Cost Management and Control
【Abstract】 In construction enterprises, the strengthening of the project cost management, and continuously reduce costs, is of great significance. Project cost reduction shows that enterprises in the construction and installation during the construction of living labor and materialized labor savings. Cost control many aspects of enterprises, the general cost projections, cost planning, cost accounting and so on. This article focuses on the cost management of construction enterprises, as well as points out the role of pre-control is a matter of control and ex post control.
【Key words】 Drainage pipeline;Quality;Control
1实施施工企业成本控制的作用
加强项目成本控制是施工企业摆脱困境,增加收入的需要。目前施工企业参与市场竞争,将面临着严峻的市场考验。现在建筑市场放开,实行招投标制,并且标底压得都非常低,要想创造效益唯一的出路就是强化内部管理,苦练内功,向内部挖潜要效益。因此,加强项目成本控制是目前一条非常现实的途径,加强项目成本控制是适应市场竞争形势,加强企业内部管理工作的需要。随着建筑企业的快速发展,建筑市场竞争越来越激烈。今后一段时期,建筑施工企业将面临日趋激烈的市场挑战,施工企业的经营环境难有大的改善。增收提效,强化成本控制与索赔将是今后加强经营管理的重点。这就要求施工企业要把各方面的工作统一到降低成本、提高效益的目标上。按照市场经济的要求钻研、调整和完善管理体制,进一步加强各项基础管理工作,将企业管理从实物管理转向价值管理,从而使成本管理成为企业管理的中心。
2施工企业成本控制原则
施工企业的成本控制是以施工项目成本控制为中心,施工企业项目经理部在对项目施工过程进行成本控制时,必须遵循以下基本原则。
2.1成本最低化原则。施工项目成本控制的根本目的,在于通过成本管理的各种手段,不断降低施工项目成本,以达到可能实现最低的目标成本的要求。在实行成本最低化原则时,应注意降低成本的可能性和合理性。一方面挖掘各种降低成本的能力,使可能性变为现实;另一方面要从实际出发,制定通过主观努力可能达到合理的最低成本水平。
2.2全面成本控制原则。全面成本管理是全企业、全员和全过程的管理,亦称“三全”管理。项目成本的全员控制有一个系统的实质性内容,包括各部门、各单位的责任网络和班组经济核算等等,应防止成本控制人人有责,人人不管。项目成本的全过程控制要求成本控制工作要随着项目施工进展的各个阶段连续进行,既不能疏漏,又不能时紧时松,使之自始至终置于有效的控制之下。
2.3动态控制原则。施工项目是一次性的,成本控制应强调项目的中间控制,即动态控制。因为施工准备阶段的成本控制只是根据施工组织设计的具体内容确定成本目标、编制成本计划、制订成本控制的方案,为今后的成本控制作好准备。而竣工阶段的成本控制,由于成本盈亏已基本定局,即使发生了偏差,也已来不及纠正。为此,加强施工中间的成本控制是关键。
2.4目标管理原则。目标管理的内容包括:目标的设定和分解,目标的责任到位和执行,检查目标的执行结果,评价目标和修正目标,形成目标管理的计划、实施、检查、处理循环,即PDCA循环。
2.5责、权、利相结的原则。在项目施工过程中,项目经理部各部门、各班组在肩负成本控制责任的同时,享有成本控制的权力,同时项目经理要对各部门、各班组在成本控制中的业绩进行定期的检查和考评,实行有奖有罚。只有真正做好责、权、利相结合的成本控制,才能收到预期的效果。
3施工企业成本控制措施
降低施工项目成本的途径,应该是既开源又节流,或者说既增收又节支。控制项目成本的措施归纳起来有三大方面:组织措施、技术措施、经济措施。
3.1组织措施。项目经理是项目成本管理的第一责任人,全面组织项目部的成本管理工作 ,应及时掌握和分析盈亏状况,并迅速采取有效措施;工程技术部是整个工程项目施工技术和进度的负责部门,应在保证质量、按期完成任务的前提下尽可能采取先进技术,以降低工程成本;经营部主管合同实施和合同管理工作,负责工程进度款的申报和催款工作,处理施工赔偿问题,经济部应注重加强合同预算管理,增创工程预算收入;财务部主管工程项目的财务工作,应随时分析项目的财务收支情况,合理调度资金;项目经理部的其它部门和班组都应精心组织,为增收节支尽责尽职。
3.2技术措施。
3.2.1制订先进的经济合理的施工方案,以达到缩短工期、提高质量、降低成本的目的。施工方案包括四大内容:施工方法的确定、施工机具的选择、施工顺序的安排和流水施工的组织。正确选择施工方案是降低成本的关键所在。
3.2.2在施工过程中努力寻求各种降低消耗、提高工效的新工艺、新技术、新材料等降低成本的技术措施。
3.2.3严把质量关,杜绝返工现象,缩短验收时间,节省费用开支。
3.3经济措施。
3.3.1人工费控制管理。主要是改善劳动组织,减少窝工浪费;实行合理的奖惩制度;加强技术教育和培训工作;加强劳动纪律,压缩非生产用工和辅助用工,严格控制非生产人员比例。
3.3.2材料费控制管理。主要是改进材料的采购、运输、收发、保管等方面的工作,减少各个环节的损耗,节约采购费用;合理堆置现场材料,避免和减少二次搬运;严格材料进场验收和限额领料制度;制订并贯彻节约材料的技术措施,合理使用材料,综合利用一切资源。
3.3.3机械费控制管理。主要是正确选配和合理利用机械设备,搞好机械设备的保养修理,提高机械的完好率、利用率和使用效率,从而加快施工进度、增加产量、降低机械使用费。
3.3.4间接费及其它直接费控制。主要是精减管理机构,合理确定管理幅度与管理层次,节约施工管理费等等。
4结语
项目成本控制的组织措施、技术措施、经济措施,三者是融为一体、相互作用的。项目经理部是项目成本控制中心,要以投标报价为依据,制定项目成本控制目标,各部门和各班组通力合作,形成以市场投标报价为基础的施工方案经济优化、物资采购经济优化、劳动力配备经济优化的项目成本控制体系。
【关键词】 排水管道;质量;控制
【中图分类号】 TU723.3 【文献标识码】 B【文章编号】 1727-5123(2009)03-029-01
Analysis of Construction Cost Management and Control
【Abstract】 In construction enterprises, the strengthening of the project cost management, and continuously reduce costs, is of great significance. Project cost reduction shows that enterprises in the construction and installation during the construction of living labor and materialized labor savings. Cost control many aspects of enterprises, the general cost projections, cost planning, cost accounting and so on. This article focuses on the cost management of construction enterprises, as well as points out the role of pre-control is a matter of control and ex post control.
【Key words】 Drainage pipeline;Quality;Control
1实施施工企业成本控制的作用
加强项目成本控制是施工企业摆脱困境,增加收入的需要。目前施工企业参与市场竞争,将面临着严峻的市场考验。现在建筑市场放开,实行招投标制,并且标底压得都非常低,要想创造效益唯一的出路就是强化内部管理,苦练内功,向内部挖潜要效益。因此,加强项目成本控制是目前一条非常现实的途径,加强项目成本控制是适应市场竞争形势,加强企业内部管理工作的需要。随着建筑企业的快速发展,建筑市场竞争越来越激烈。今后一段时期,建筑施工企业将面临日趋激烈的市场挑战,施工企业的经营环境难有大的改善。增收提效,强化成本控制与索赔将是今后加强经营管理的重点。这就要求施工企业要把各方面的工作统一到降低成本、提高效益的目标上。按照市场经济的要求钻研、调整和完善管理体制,进一步加强各项基础管理工作,将企业管理从实物管理转向价值管理,从而使成本管理成为企业管理的中心。
2施工企业成本控制原则
施工企业的成本控制是以施工项目成本控制为中心,施工企业项目经理部在对项目施工过程进行成本控制时,必须遵循以下基本原则。
2.1成本最低化原则。施工项目成本控制的根本目的,在于通过成本管理的各种手段,不断降低施工项目成本,以达到可能实现最低的目标成本的要求。在实行成本最低化原则时,应注意降低成本的可能性和合理性。一方面挖掘各种降低成本的能力,使可能性变为现实;另一方面要从实际出发,制定通过主观努力可能达到合理的最低成本水平。
2.2全面成本控制原则。全面成本管理是全企业、全员和全过程的管理,亦称“三全”管理。项目成本的全员控制有一个系统的实质性内容,包括各部门、各单位的责任网络和班组经济核算等等,应防止成本控制人人有责,人人不管。项目成本的全过程控制要求成本控制工作要随着项目施工进展的各个阶段连续进行,既不能疏漏,又不能时紧时松,使之自始至终置于有效的控制之下。
2.3动态控制原则。施工项目是一次性的,成本控制应强调项目的中间控制,即动态控制。因为施工准备阶段的成本控制只是根据施工组织设计的具体内容确定成本目标、编制成本计划、制订成本控制的方案,为今后的成本控制作好准备。而竣工阶段的成本控制,由于成本盈亏已基本定局,即使发生了偏差,也已来不及纠正。为此,加强施工中间的成本控制是关键。
2.4目标管理原则。目标管理的内容包括:目标的设定和分解,目标的责任到位和执行,检查目标的执行结果,评价目标和修正目标,形成目标管理的计划、实施、检查、处理循环,即PDCA循环。
2.5责、权、利相结的原则。在项目施工过程中,项目经理部各部门、各班组在肩负成本控制责任的同时,享有成本控制的权力,同时项目经理要对各部门、各班组在成本控制中的业绩进行定期的检查和考评,实行有奖有罚。只有真正做好责、权、利相结合的成本控制,才能收到预期的效果。
3施工企业成本控制措施
降低施工项目成本的途径,应该是既开源又节流,或者说既增收又节支。控制项目成本的措施归纳起来有三大方面:组织措施、技术措施、经济措施。
3.1组织措施。项目经理是项目成本管理的第一责任人,全面组织项目部的成本管理工作 ,应及时掌握和分析盈亏状况,并迅速采取有效措施;工程技术部是整个工程项目施工技术和进度的负责部门,应在保证质量、按期完成任务的前提下尽可能采取先进技术,以降低工程成本;经营部主管合同实施和合同管理工作,负责工程进度款的申报和催款工作,处理施工赔偿问题,经济部应注重加强合同预算管理,增创工程预算收入;财务部主管工程项目的财务工作,应随时分析项目的财务收支情况,合理调度资金;项目经理部的其它部门和班组都应精心组织,为增收节支尽责尽职。
3.2技术措施。
3.2.1制订先进的经济合理的施工方案,以达到缩短工期、提高质量、降低成本的目的。施工方案包括四大内容:施工方法的确定、施工机具的选择、施工顺序的安排和流水施工的组织。正确选择施工方案是降低成本的关键所在。
3.2.2在施工过程中努力寻求各种降低消耗、提高工效的新工艺、新技术、新材料等降低成本的技术措施。
3.2.3严把质量关,杜绝返工现象,缩短验收时间,节省费用开支。
3.3经济措施。
3.3.1人工费控制管理。主要是改善劳动组织,减少窝工浪费;实行合理的奖惩制度;加强技术教育和培训工作;加强劳动纪律,压缩非生产用工和辅助用工,严格控制非生产人员比例。
3.3.2材料费控制管理。主要是改进材料的采购、运输、收发、保管等方面的工作,减少各个环节的损耗,节约采购费用;合理堆置现场材料,避免和减少二次搬运;严格材料进场验收和限额领料制度;制订并贯彻节约材料的技术措施,合理使用材料,综合利用一切资源。
3.3.3机械费控制管理。主要是正确选配和合理利用机械设备,搞好机械设备的保养修理,提高机械的完好率、利用率和使用效率,从而加快施工进度、增加产量、降低机械使用费。
3.3.4间接费及其它直接费控制。主要是精减管理机构,合理确定管理幅度与管理层次,节约施工管理费等等。
4结语
项目成本控制的组织措施、技术措施、经济措施,三者是融为一体、相互作用的。项目经理部是项目成本控制中心,要以投标报价为依据,制定项目成本控制目标,各部门和各班组通力合作,形成以市场投标报价为基础的施工方案经济优化、物资采购经济优化、劳动力配备经济优化的项目成本控制体系。