江苏省目前普遍使用的老苏排Ⅱ型泵站,能耗高,装置效率低。由省水利厅农水处、江苏工学院、盐城、无锡、射阳、宜兴市县水利农机局及盐城水厂,从1988年春起,经一年多时间的试验研究,改造成的新苏排Ⅱ型泵站,将扬程由原1.7米提高到2~2.4米,流量由1.4立方米/秒提高到2立方米/秒以上,装置效率由40%提高到58~60%,并于1989
Jiangsu Province, the common use of the old Soviet row II pumping station, high energy consumption, low efficiency. From the Department of Water Resources of Guangdong Provincial Department of Water Resources, Jiangsu Institute of Technology, Yancheng, Wuxi, Sheyang, Yixing County Water Conservancy Bureau and Yancheng Waterworks, from the spring of 1988, after more than a year of experimental research, into a new Soviet row Ⅱ pump station, the lift from the original 1.7 meters to 2 to 2.4 meters, flow from 1.4 cubic meters / second to 2 cubic meters / second above, the device efficiency from 40% to 58 to 60%, and in 1989