论文部分内容阅读
在开发建设项目水土保持方案概算编制中独立费用存在编制偏高,计算依据混乱等问题。由于独立费用偏高,继而带动整个水土保持方案的投资偏高。通过案例分析,查出在独立费用计算中存在的问题,继而从独立费用计算的原则、计算依据、计算方法、计算过程、计算参数等几个方面剖析了偏高的原因,同时提出计算方法。
In the development and construction of water and soil conservation program budget estimates in the preparation of independent costs exist in the preparation of high, calculated based on chaos and other issues. Due to the high cost of independence, the investment in the entire soil and water conservation program will be boosted. Through the case study, the author found out the problems in the calculation of the independent expenses, and then analyzed the reasons of the high prices from several aspects such as the principle of independent cost calculation, calculation basis, calculation process, calculation parameters and so on. At the same time, the calculation method was put forward.