对公共建筑智能化工程管理的研究

来源 :城市建筑 | 被引量 : 0次 | 上传用户:dongdongthere
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新时期建筑业的发展越来越趋向于智能化,而作为为人们提供多方面服务(包括体育、文化、医疗、娱乐等)的公共建筑场所,它的智能化发展更富有重要的意义。可是由于公共建筑具有的自身特点:实施技术难度高,智能化系统之间相关性强,规划设计与工程实施过程中都需要做大量的管理、协调工作。本文主要探讨了公共建筑智能化的顺利正常运行。 The development of the construction industry in the new era is becoming more and more intelligent. And its intelligent development is more and more important as a public construction site that provides people with various services (including sports, culture, medical treatment, entertainment, etc.). However, due to its own characteristics of public buildings: the implementation of technical difficulties, the strong correlation between intelligent systems, planning and design and implementation of the project need to do a lot of management and coordination. This article mainly discusses the smooth and normal operation of public buildings intelligent.
其他文献
肿瘤转移有其选择性和特异性,不同组织来源的肿瘤易向某些特定的组织和器官如淋巴结、肺、肝、骨等转移,但人们对其机制知之甚少.近年来,发现不少趋化因子及其受体在肿瘤的转移中扮演重要角色.现就CCL19/21-CCR7生物学轴在肿瘤转移中的作用作一综述。
目的 比较肝功能处于代偿期的肝癌合并门静脉癌栓患者不同治疗方法 的疗效并探讨影响其疗效的因素.方法 50例肝癌合并门静脉癌栓患者,根据不同的治疗方法 分为四组:保守治疗组12例、化疗组12例、手术切除组13例、手术切除加化疗组13例.结果 保守治疗组中位生存时间3.5个月;化疗组中位生存时间7.1个月;手术切除组中位生存时间10.3个月;而手术切除加化疗组中位生存时间13.4个月,术后0.5、1、