论文部分内容阅读
本文对在丹江口水电站4号机上做的高压油顶起和水冷瓦试验进行了较详细的说明。证明文中推荐的试验装置是可行的。对今后的有关设计和运行提供了实践经验。
In this paper, Danjiangkou Hydropower Station on the 4th machine to do high-pressure oil jacking and water-cooled tile test carried out a more detailed description. The test equipment recommended in the proof is feasible. The design and operation of the future provided practical experience.