摘要:建筑工程造价在我国长久存在概算超估算、预算超概算、决算超预算的现象,严重困扰着建筑工程投资效益管理。通过研究工程造价管理中存在的问题,采取有效措施确定和有效控制工程造价,保证工程造价管理的合理性和科学性,从而为优化资金使用,降低投资成本,合理使用人力、财力、物力,提高固定资产投资效益起到积极的作用。现就目前建筑工程造价中存在的问题结合我们的工作实践,谈几点如何控制工程造价的措施,以供同行参考。
关键词:工程造价管理;问题;措施
Abstract: the construction project cost in China long endure budget exceeds the estimation, the budget and final accounts of the budget estimates the phenomenon, serious with construction engineering benefit of investment management. Through the research project cost the problems existing in the management and take effective measures to determine and effective control of the project cost, ensure the rationality of the project cost management and scientific, thereby to optimize the use of fund and lower investment cost, reasonable use human, financial and material resources, and improve the efficiency of investment in fixed assets will exert positive role. Now is currently building project cost the problems existing in the combined with our work practice, offer some of the measures of how to control the engineering cost, and provide the reference for colleague.
Keywords: engineering cost management; Problem; measures
中图分类号:TU723.3文献标识码:A 文章编号
一、建筑工程造价管理中存在的问题
1、忽视前期工程的造价控制
长期以来,建设单位普遍忽视了工程建设项目前期工作阶段的造价控制,而是把重点放在施工阶段——审核施工图预算、工程结算价款。企业对工程造价管理及其管理人员的作用重视不够,忽略了前期工作阶段作为投资控制基础的投资估算和设计概算的作用,因此,造成了概算超估算,预算超概算,结算超预算的“三超”现象。
2、不重视成本控制管理。
在施工管理过程中对成本控制管理不到位,不能切实地将经济问题与技术问题有机地结合到一起,没有尽早发现经济管理中存在的问题,待工程竣工时才发现经济问题,已无法弥补。在施工过程中只重视技术、生产,不重视成本的节约,不能将优化技术方案、改进施工工艺降低建设成本列入到生产管理过程中来。技术人员与经营管理人员互不通气,造成成本的人为不可控制状态。
3、工程造价控制各环节相互脱节。
投资估算、设计概算、施工图预算、合同价、工程结算价分别由建设单位及其主管部门、设计单位、施工单位各自管理,互相脱节,没有一个完整的控制系统。企业的报价管理人员与项目的经营管理人员工作沟通不够,大多数的企业报价管理人員和项目上的经营管理人员是分开的,管理环节上存在漏洞,投标人员的投标思想没有制度来保证准确无误地传递给施工现场的经营管理人员,迫使投标者与施工管理者只能依据社会平均水平这一标准来完成各自的工作。
4、缺乏对已完工程在工程造价控制方面的评价体系。
没有科学的评价体系,导致企业无法形成适合本企业的报价体系,这就是对企业资源的巨大浪费,珍贵的经济技术数据随着建筑物的完成而消失。由此,企业失去了持续发展的物质基础,在此方面的管理上始终在低水平上徘徊。
二、应采取的措施
1、建设工程招投标制度是建设单位控制工程造价的有效手段。
通过招投标可以提高建设工程的经济效益,保证建设工程的质量,缩短建设投资的回报周期,建设单位可以充分利用招投标这一有效手段进行工程造价控制。要求在招投标中采用提供工程量清单,工程量清单的编制应遵循客观、公正、科学、合理的原则。按照国家或地方颁布的计算规则即统一的工程项目划分方法、统一的计量单位及统一的工程量计算规则,根据设计图纸计算并予以统计、排列,从而得出清单。2、培养一支德才兼备的高素质工程造价队伍。
工程造价管理是一门综合性的学科,它涉及到技术、经济、法规及管理知识,这就要求工程造价人员不仅要具有较强的财务预算能力,还应当具备一定的工程设计知识和施工经验,以及材料与机械施工技术等综合性的科学知识,这样才能在工程量计算时不重不漏。同时,更要具备较强的敬业责任心和高尚的行业道德。特别是在市场经济体制逐步完善、投资趋势多元化的形势下,迫切需要一批为项目提供科学决策依据和对工程造价管理的高素质人员,这就要求工程造价人员通过各种渠道学习新知识,并在工作实践中发挥自身的工作主动性,不断创新,提高自身的预算技术水平和素质。目前我国已对工程造价人员实行执业资格的准入制度,并相继出台了有关具体的规定,工程造价人员应尽快提高素质,适应市场经济的需求。
3、规范招标文件,创造公平竞争的市场环境。
招标投标应是工程预算竞争中有序的一种市场行为。建筑市场通过招、投标,使得建设单位和承包单位进入建筑市场进行公平交易、平等竞争,避免和减少工程承、发包过程中行贿受贿等营私舞弊行为,进而确保工程质量和提高投资效益。建设单位要根据工程招标固有特点和运行规律,合理地确定招标范围,选择理想的招标方式,详细分析施工方案,充分考虑不可预见等因素,编制科学的标底或工程量清单,做好招标工作的价格计算和控制;采用合理的评标、定标的方法,优选中标单位,确保工程造价控制在限额以内。
4、严格按标准设计动态控制工程造价
搞好工程设计阶段的造价控制是有效控制工程造价的关键。设计标准是国家经济建设的重要技术规范,是进行工程建设勘察、设计、施工及验收的重要依据。各类建设设计部门制定、执行相应的不同层次的设计标准规范,对于提高设计阶段的投资控制水平是十分必要的。工程造价人员在设计过程中与设计人员要密切配合,及时对工程项目投资进行对比分析,反馈造价信息,必要时应会同工程设计人员、施工管理人员共同论证,做出合理地预算;工程在设计过程中执行标准设计,可以促进工业化水平,加快工程进度,同样工程预算也要执行标准,按规范标准预算就可节约材料、降低建设投资;要推行限额设计,加强限额设计中的动态管理,实现对设计规范、设计标准、工程数量与概预算指标等各方面的动态控制管理。
5、施工阶段的工程造价控制
施工阶段是落实合同、实施投资控制的操作过程,是工程设计意图最终实现并形成工程实物的阶段,由于施工过程周期长,影响因素多,应采取有效的措施加强这一阶段的投资控制,对管好用好资金,提高投资效益具有重要的意义。
5、1施工阶段存在的问题
1、施工单位建筑工程造价的控制目标制定不合理,缺乏科学性和先进性;
2、材料价格管理方法落后,材料采购、储存量计算不科学,不能很好地掌握采购时机,由于建筑市场目前还比较混乱,材料采购价格失真,不法分子从中渔利,也使得占建安工程成本60%——70%的材料费用失去控制。
3、施工组织方,多数施工企业还一直沿用老办法,现有的人、财、物没能得到合理配置与利用,造成大量浪费,从而导致工程造价提高。
4、施工单位从自身利益出发,通过设计变更,增加工程量或追求较高利润。
5、2施工阶段的工程造价控制
(1)工程项目实施阶段项目管理方式的策划。项目管理方式的合理选择是控制工程质量、进度、投资三大目标的主要保证。
(2)熟悉设计图纸和设计要求,对可能出现的工程费用变化大的部分和环节,作为重点造价控制对象;
(3)施工前,要组织施工人员到现场踏勘,并对图纸进行会审、技术交底,避免施工中出现不应有的返工,特别是那种涉及费用较高的设计变更,必须经设计单位、建设单位现场代表、监理公司、施工单位等几方在现场核实并进行技术及经济比较,尽量减少合同外费用。
(4)详细进行工程计量,复核工程付款帐单,严格现场签证管理。及时做好施工现场记录,制定现场签证的管理程序,加强现场签证的管理,工程签证随做随签,避免“一揽子”及日后签证,同时签证尽可能量化,避免仅作定性或含糊不清的签证。
(5)对于某些子项目,可以采取先作样板后正式铺开的做法。这种做法的好处在于,可以通过样板发现施工图纸中不能发现的问题,从而避免正式展开施工后出现大面积返工的情况。
(6)做好材料、设备的定货、采购、供应工作,严把材料设
6、严格合同管理,减少工程变更与索赔。
施工合同是施工阶段造价控制的依据。签订施工承包合同要严密,同时,在施工中加强合同管理,才能保证合同造价的合理性、合法性,减少履行合同中甲、乙双方的纠纷,维护合同双方利益,有效地控制工程投资造价。
注:文章内所有公式及图表请用PDF形式查看。
关键词:工程造价管理;问题;措施
Abstract: the construction project cost in China long endure budget exceeds the estimation, the budget and final accounts of the budget estimates the phenomenon, serious with construction engineering benefit of investment management. Through the research project cost the problems existing in the management and take effective measures to determine and effective control of the project cost, ensure the rationality of the project cost management and scientific, thereby to optimize the use of fund and lower investment cost, reasonable use human, financial and material resources, and improve the efficiency of investment in fixed assets will exert positive role. Now is currently building project cost the problems existing in the combined with our work practice, offer some of the measures of how to control the engineering cost, and provide the reference for colleague.
Keywords: engineering cost management; Problem; measures
中图分类号:TU723.3文献标识码:A 文章编号
一、建筑工程造价管理中存在的问题
1、忽视前期工程的造价控制
长期以来,建设单位普遍忽视了工程建设项目前期工作阶段的造价控制,而是把重点放在施工阶段——审核施工图预算、工程结算价款。企业对工程造价管理及其管理人员的作用重视不够,忽略了前期工作阶段作为投资控制基础的投资估算和设计概算的作用,因此,造成了概算超估算,预算超概算,结算超预算的“三超”现象。
2、不重视成本控制管理。
在施工管理过程中对成本控制管理不到位,不能切实地将经济问题与技术问题有机地结合到一起,没有尽早发现经济管理中存在的问题,待工程竣工时才发现经济问题,已无法弥补。在施工过程中只重视技术、生产,不重视成本的节约,不能将优化技术方案、改进施工工艺降低建设成本列入到生产管理过程中来。技术人员与经营管理人员互不通气,造成成本的人为不可控制状态。
3、工程造价控制各环节相互脱节。
投资估算、设计概算、施工图预算、合同价、工程结算价分别由建设单位及其主管部门、设计单位、施工单位各自管理,互相脱节,没有一个完整的控制系统。企业的报价管理人员与项目的经营管理人员工作沟通不够,大多数的企业报价管理人員和项目上的经营管理人员是分开的,管理环节上存在漏洞,投标人员的投标思想没有制度来保证准确无误地传递给施工现场的经营管理人员,迫使投标者与施工管理者只能依据社会平均水平这一标准来完成各自的工作。
4、缺乏对已完工程在工程造价控制方面的评价体系。
没有科学的评价体系,导致企业无法形成适合本企业的报价体系,这就是对企业资源的巨大浪费,珍贵的经济技术数据随着建筑物的完成而消失。由此,企业失去了持续发展的物质基础,在此方面的管理上始终在低水平上徘徊。
二、应采取的措施
1、建设工程招投标制度是建设单位控制工程造价的有效手段。
通过招投标可以提高建设工程的经济效益,保证建设工程的质量,缩短建设投资的回报周期,建设单位可以充分利用招投标这一有效手段进行工程造价控制。要求在招投标中采用提供工程量清单,工程量清单的编制应遵循客观、公正、科学、合理的原则。按照国家或地方颁布的计算规则即统一的工程项目划分方法、统一的计量单位及统一的工程量计算规则,根据设计图纸计算并予以统计、排列,从而得出清单。2、培养一支德才兼备的高素质工程造价队伍。
工程造价管理是一门综合性的学科,它涉及到技术、经济、法规及管理知识,这就要求工程造价人员不仅要具有较强的财务预算能力,还应当具备一定的工程设计知识和施工经验,以及材料与机械施工技术等综合性的科学知识,这样才能在工程量计算时不重不漏。同时,更要具备较强的敬业责任心和高尚的行业道德。特别是在市场经济体制逐步完善、投资趋势多元化的形势下,迫切需要一批为项目提供科学决策依据和对工程造价管理的高素质人员,这就要求工程造价人员通过各种渠道学习新知识,并在工作实践中发挥自身的工作主动性,不断创新,提高自身的预算技术水平和素质。目前我国已对工程造价人员实行执业资格的准入制度,并相继出台了有关具体的规定,工程造价人员应尽快提高素质,适应市场经济的需求。
3、规范招标文件,创造公平竞争的市场环境。
招标投标应是工程预算竞争中有序的一种市场行为。建筑市场通过招、投标,使得建设单位和承包单位进入建筑市场进行公平交易、平等竞争,避免和减少工程承、发包过程中行贿受贿等营私舞弊行为,进而确保工程质量和提高投资效益。建设单位要根据工程招标固有特点和运行规律,合理地确定招标范围,选择理想的招标方式,详细分析施工方案,充分考虑不可预见等因素,编制科学的标底或工程量清单,做好招标工作的价格计算和控制;采用合理的评标、定标的方法,优选中标单位,确保工程造价控制在限额以内。
4、严格按标准设计动态控制工程造价
搞好工程设计阶段的造价控制是有效控制工程造价的关键。设计标准是国家经济建设的重要技术规范,是进行工程建设勘察、设计、施工及验收的重要依据。各类建设设计部门制定、执行相应的不同层次的设计标准规范,对于提高设计阶段的投资控制水平是十分必要的。工程造价人员在设计过程中与设计人员要密切配合,及时对工程项目投资进行对比分析,反馈造价信息,必要时应会同工程设计人员、施工管理人员共同论证,做出合理地预算;工程在设计过程中执行标准设计,可以促进工业化水平,加快工程进度,同样工程预算也要执行标准,按规范标准预算就可节约材料、降低建设投资;要推行限额设计,加强限额设计中的动态管理,实现对设计规范、设计标准、工程数量与概预算指标等各方面的动态控制管理。
5、施工阶段的工程造价控制
施工阶段是落实合同、实施投资控制的操作过程,是工程设计意图最终实现并形成工程实物的阶段,由于施工过程周期长,影响因素多,应采取有效的措施加强这一阶段的投资控制,对管好用好资金,提高投资效益具有重要的意义。
5、1施工阶段存在的问题
1、施工单位建筑工程造价的控制目标制定不合理,缺乏科学性和先进性;
2、材料价格管理方法落后,材料采购、储存量计算不科学,不能很好地掌握采购时机,由于建筑市场目前还比较混乱,材料采购价格失真,不法分子从中渔利,也使得占建安工程成本60%——70%的材料费用失去控制。
3、施工组织方,多数施工企业还一直沿用老办法,现有的人、财、物没能得到合理配置与利用,造成大量浪费,从而导致工程造价提高。
4、施工单位从自身利益出发,通过设计变更,增加工程量或追求较高利润。
5、2施工阶段的工程造价控制
(1)工程项目实施阶段项目管理方式的策划。项目管理方式的合理选择是控制工程质量、进度、投资三大目标的主要保证。
(2)熟悉设计图纸和设计要求,对可能出现的工程费用变化大的部分和环节,作为重点造价控制对象;
(3)施工前,要组织施工人员到现场踏勘,并对图纸进行会审、技术交底,避免施工中出现不应有的返工,特别是那种涉及费用较高的设计变更,必须经设计单位、建设单位现场代表、监理公司、施工单位等几方在现场核实并进行技术及经济比较,尽量减少合同外费用。
(4)详细进行工程计量,复核工程付款帐单,严格现场签证管理。及时做好施工现场记录,制定现场签证的管理程序,加强现场签证的管理,工程签证随做随签,避免“一揽子”及日后签证,同时签证尽可能量化,避免仅作定性或含糊不清的签证。
(5)对于某些子项目,可以采取先作样板后正式铺开的做法。这种做法的好处在于,可以通过样板发现施工图纸中不能发现的问题,从而避免正式展开施工后出现大面积返工的情况。
(6)做好材料、设备的定货、采购、供应工作,严把材料设
6、严格合同管理,减少工程变更与索赔。
施工合同是施工阶段造价控制的依据。签订施工承包合同要严密,同时,在施工中加强合同管理,才能保证合同造价的合理性、合法性,减少履行合同中甲、乙双方的纠纷,维护合同双方利益,有效地控制工程投资造价。