目前,建设工程领域的国有投资项目普遍编制招标最高限价,提供工程量清单或者施工图编制最高限价,为编制好最高限价,通过工程量清单计价前后政策对比分析,阐述了最高限价的概念和由来,并结合实际,说明了实行最高限价的作用与意义,针对工作中容易出现的薄弱环节提出了预防性措施要求。
At present, the state-owned investment projects in the field of construction projects generally prepare the bidding ceiling price and provide the maximum price for the construction quantity list or construction drawing plan. In order to prepare the maximum price limit, the comparative analysis of the policy before and after the bill of quantities calculation expounds the ceiling price The concept and origin of the work, combined with the actual situation, illustrates the role and significance of the implementation of the ceiling price, and puts forward the requirements of precautionary measures in light of the vulnerable parts of the work.