施工日记最能反映施工现场每天的施工部位、人员数量、遇到问题、解决办法;材料进场、检测情况;天气情况、索赔情况和设计变更等内容。新人进入施工现场,最先要学的就是记施工日志,施工日记的内容可分为五类:基本内容、工作内容、检验内容、检查内容及其他内容。施工日记1.基本内容(1)日期、星期、气象、平均温度。(2)施工部位。(3)出勤人数、操作负责人。2.工作内容(1)当日施工内容及实际完成情况。(2)施工现场有关会议的主要内容。(3)有关领导、主管部门或各种检查组对工程施工技术、质量、安全方面的检
The construction diary can best reflect the daily construction site, number of personnel, problems encountered, and solutions to the construction site; materials entering and testing conditions; weather conditions, claim conditions, and design changes. When new people enter the construction site, the first thing to learn is to record the construction log. The contents of the construction diary can be divided into five categories: basic content, work content, inspection content, inspection content, and other content. Construction diary 1. Basic content (1) Date, week, weather, average temperature. (2) Construction site. (3) Attendance, operation person in charge. 2. Work content (1) Construction content and actual completion on the day. (2) The main contents of the relevant meeting of the construction site. (3) Examination of the construction technology, quality and safety of relevant leaders, competent authorities or various inspection teams