黄丹水电站是马边河流域资源开发的启动工程,沐川县脱贫致富的希望工程。该工程由能源部、水利部成都勘测设计研究院设计。1991年10月15日国家计委批准列顶。黄丹水电站位于沐川县黄丹镇下游4km。具有周调节水库。正常蓄水位378m,电站设计水头23m,引用流量228.6m~3/s,泄水建筑物位于右岸主河槽内,最大坝高54.5m,坝长232.5
Huangdan Hydropower Station is a project to start the exploitation of resources in the Mabian River Basin and Hope Project to Leap from Poverty in Muchuan County. The project by the Ministry of Energy, Ministry of Water Resources Chengdu Survey Design and Research Institute. October 15, 1991 State Planning Commission approved the top. Huangdan Hydropower Station is located in Muchuan County Huangdan downstream 4km. With weekly conditioning reservoir. The normal water level is 378m, the design head of the power station is 23m and the reference flow rate is 228.6m 3 / s. The drainage structure is located in the main channel of the right bank. The maximum dam height is 54.5m and the dam length is 232.5