论文部分内容阅读
以内蒙古师范大学国际交流中心综合楼基坑降水工程为例,根据场地的工程地质条件及水文地质条件,确定基坑降水的设计参数,介绍了深基坑降水的设计方案,总结了降水施工时应考虑的因素,从而为类似的工程积累经验。
Taking the foundation pit dewatering project of the International Exchange Center of Inner Mongolia Normal University as an example, the design parameters of foundation pit dewatering are determined according to the engineering geological conditions and hydrogeological conditions of the site. The design scheme of dewatering for deep foundation pit is introduced. Factors that should be considered to gain experience for similar projects.