论文部分内容阅读
新钢公司烧结厂现有33m~2烧结机一台,24m~2烧结机两台,总有效烧结面积81m~2。1998年生产烧结矿114.259万 t,比上年增产260674t,同比增长29.56%。高炉熟料比比上年增加7.85个百分点,为公司生铁同比增产23.18%作出了重要贡献。同时烧结固体燃耗71kg 标煤/t,电耗42.05kWh/t,分别比上年下降13.41%和14.06%,创本厂烧结生产历史最好水平。
Xin Gang Iron and Steel Company sintering plant existing 33m ~ 2 sintering machine, 24m ~ 2 sintering machine two, the total effective sintering area of 81m ~ 2. In 1998 the production of 11425900 t sintered ore, 260674t increase over the previous year, an increase of 29.56% . Blast furnace clinker increased 7.85 percentage points over the previous year, making an important contribution to the Company’s pig iron production increase of 23.18% over the same period of last year. At the same time sintering solid fuel consumption 71kg standard coal / t, power consumption 42.05kWh / t, respectively, down 13.41% over the previous year and 14.06%, a factory sintered the best level of history.