论文部分内容阅读
小截面预制桩是一种先进的施工技术,在具体应用中有着广泛的前景,能适应各种地质条件,尤其是在土层分布不均的山区进行施工更能体现出其独特的优点,但其在具体施工时质量控制与管理相当重要,本文主要以福建省闽通宁化汽车站工程为例,针对小截面预制桩施工情况探讨其在静压法施工下的质量控制。
Small section precast pile is an advanced construction technology, which has broad prospects in specific applications and can adapt to various geological conditions, especially in mountainous areas with unevenly distributed soil, which can better reflect its unique advantages. However, Its quality control and management are very important in concrete construction. This paper takes Fujian Minhang Ninghua bus station project as an example, and discusses its quality control under the static pressure method for the construction of small section precast piles.