论文部分内容阅读
冶金部委托昆明有色冶金设计研究院主持的井巷工程通用设计初审会议于1979年12月10日至22日在昆明召开,参加会议的有部属、省属十四个冶金设计和研究单位,特邀了煤矿设计院、井巷公司和高等院校等有关的四个单位参加,正式代表42人。为了提高井巷工程设计质量,统一我国冶金矿山井巷工程设计标准,满足施工建设要求,为机械化施工创造方便条件,会议在总结建国三十年来冶金矿山井巷工程设计、施工建设经验
Ministry of Metallurgy commissioned Kunming Nonferrous Metallurgical Design and Research Institute presided over the first phase of the general meeting of mine shaft engineering design held in December 10, 1979 to 22 in Kunming, attended the meeting of subordinates, the provincial fourteen metallurgical design and research units, special Invited Coal Mine Design Institute, Wells Lane Company and institutions of higher learning and other related four units to participate, the official representative of 42 people. In order to improve the design quality of the shaft and tunnel engineering, unify the engineering design standard of mine’s mine shaft, meet the requirements of construction and construction, and create convenient conditions for mechanized construction. After summarizing the design and construction of metallurgical mine shaft and tunnel construction in the past 30 years