论文部分内容阅读
项目概况福州某商业广场位于福州市仓山区,由购物中心、商务酒店、写字楼、室外步行街、酒店式公寓及底商组成。总建筑面积约六十多万平米,商业综合体建筑面积约十八余万平米。BIM技术应用于该项目,取得了良好效果,很好地解决了工程设计质量的控制问题,并能有效地对项目组进行协同管理。应用BIM技术,全面自动控制工程项目设计质量,完成项目建模,碰撞检测,三维模拟分析,辅助管综设计,
Project Overview Located in Cangshan District, Fuzhou, a commercial plaza in Fuzhou consists of shopping malls, business hotels, office buildings, outdoor pedestrian streets, serviced apartments and the end of the business. The total construction area of about more than 600,000 square meters, commercial complex construction area of about 180,000 square meters. The BIM technology has been applied to this project and has achieved good results. It has solved the problem of engineering design quality control well and effectively managed the project team collaboratively. Application of BIM technology, a comprehensive automatic control of project design quality, complete project modeling, collision detection, three-dimensional simulation analysis, auxiliary tube design,