论文部分内容阅读
1.建造地窖 (1)窖址的选择与设计应选择在地势略高,通风良好的地方,最好在树荫下。窖容积为30立方米,半地下式,窖身东西方向。窖门设在西端,离窖底40厘米,门高1.6米,宽70厘米。在窖的东端设一高、宽各为40厘米的通风降温口,左右墙各设有30厘米×40厘米的排气孔,窖顶设一高1米,长、宽各60厘米的天窗,并安有窗扇铁网,以便通风排气及防鼠害。 (2)窖内设施窖壁用灰沙或泥土抹光。窖底铺3~4厘米厚的沙子,用于调节湿度。30立方米的地窖
1. Construction of cellars (1) cellar site selection and design should be chosen in the slightly elevated, well-ventilated place, preferably in the shade. Cellar volume of 30 cubic meters, semi-underground type, cellar east-west direction. Cellar door located in the west, 40 cm from the bottom of the cellar, 1.6 meters high, 70 cm wide. In the eastern end of the pit set a high, wide 40 cm ventilation cooling mouth, the left and right walls are equipped with 30 cm × 40 cm vent, the top of the pit set up a 1 meter high, 60 cm long and wide skylights , And a sash iron net, so as to ventilation and anti-rodent. (2) cellar facilities pit walls with gray sand or soil trowel. The bottom of the pit shop 3 ~ 4 cm thick sand, used to regulate humidity. 30 cubic meters of cellar