论文部分内容阅读
山洪沟防洪治理是构建山洪灾害防御体系的重要建设内容之一,将与非工程措施一道,构成山洪灾害的综合防御体系。辽宁省纳入《全国中小河流治理和病险水库除险加固、山洪地质灾害防御和综合治理总体规划》的重点山洪沟防洪治理项目共42项。本地区冬季长、跨汛期、施工期短,完成年度投资计划与建设任务面临时间紧、任务重的困难。总结了在前期工作、招标投标、施工建设、质量管理及工程验收5个方面的做法与取得的经验,为后续项目的实施提供参考借鉴。
Shanyong ditch flood control and management is to build one of the important construction content of mountain flood disaster prevention system, together with non-engineering measures to form a comprehensive defense system of mountain torrent disasters. Liaoning Province, included in the “national management of small and medium-sized rivers and dangerous reservoirs reinforcement, flood prevention and comprehensive management of geological disasters, master plan,” the key Shan flood ditch flood control projects a total of 42. Long winter in this region, across the flood season, the construction period is short, to complete the annual investment plan and construction tasks are facing tight schedule, heavy task difficulties. Summed up the preliminary work, bidding, construction, quality management and project acceptance of the five practices and experience gained for the follow-up project to provide reference for reference.