近年来,随着高层建筑、地铁以及各种大型地下建筑基础埋深的增加,以及周围环境和施工场地的限制,地下连续墙逐渐取代传统的施工方法成为深基础施工的有效手段。以槽板式钢筋混凝土地下连续墙为研究对象,阐述并分析地下连续墙各个施工工序中的技术要点和难点,并提出针对性的解决意见,为我国地下连续墙的施工起到了一定的借鉴意义。
In recent years, with the increase of the buried depth of high-rise buildings, metro and various large-scale underground structures and the restriction of the surrounding environment and construction site, the diaphragm wall gradually replacing the traditional construction methods has become an effective means of deep foundation construction. Taking slotted reinforced concrete continuous diaphragm wall as the research object, the technical points and difficulties in every construction sequence of the diaphragm continuous wall are expounded and analyzed, and some suggestions are put forward to solve the problems. This will be of some reference for the construction of diaphragm wall in China.