三峡工程分三期施工,1993年开工,计划2009年竣工。今后6年,三峡工程的主要建设目标是完成总长665米的右岸大坝、布置有12台机组的右岸电站和通航建筑物中的垂直升船机。2007年5月右岸大坝具备挡水条件,7月三峡水库蓄水至海拔156米高程。2007年12月右岸大坝土建全部完工,三峡大坝全线达到海拔185米坝顶高程。右岸电站计划于2005年12月开始机组安装,2007年年底两台机组发电,2009
Three Gorges Project in three phases of construction, started in 1993, is scheduled to be completed in 2009. In the next six years, the main objective of the Three Gorges Project will be to complete the right-bank dam of 665 meters in length, the right bank power plant with 12 units and the vertical shiplift in the navigable buildings. In May 2007, the dam on the right bank was equipped with water-retaining conditions. In July, the Three Gorges Reservoir charged up to 156 meters above sea level. In December 2007, the construction of the dam on the right bank was completely completed and the crest of the Three Gorges Dam reached an altitude of 185 meters. Right bank power plant plans to begin in December 2005 to install units, by the end of 2007 two generating units, 2009