本文概述了一座铀矿为了满足环境对粉尘、辐射和柴油设备提出的要求而必须采取的大风量通风。讨论了高度机械化作业的采矿方法这一关键性的设计因素。简述了主送风机和主抽风机的结构与安装,以及矿山风井和配风系统的布置。在设计中重点考虑了以风门和密闭墙作为风流控制设施。最后,为了解决动力费用的不断上涨,有必要降低通风条件,改进通风措施。
This paper outlines the need for large-volume ventilation at a uranium mine to meet the environmental requirements for dust, radiation and diesel equipment. Discusses the key design considerations for mining methods for highly mechanized operations. The structure and installation of the main blower and the main blower, as well as the layout of mine shaft and air distribution system are briefly described. Focus on the design in the throttle and the wall as the wind flow control facilities. Finally, in order to address the rising cost of power, it is necessary to reduce ventilation and improve ventilation.