摘要:建筑机电安装工程是整个建筑工程项目中画龙点睛的一环,承担着将建筑亮化和智能化的功能,因此提高机电安装施工管理技术意义重大。正是从这个角度出发,本文以弱电系统工程及其接地技术的施工及管理要点为引子来探讨了建筑工程机电安装施工管理技术,具有一定的实践意义和参考价值。
关键词:机电安装新兴技术质量控制技术要点
Abstract: building mechanical and electrical installation engineering is the construction project of touch in a ring, bears architectural lighting and intelligent functions, improving the management of mechanical and electrical installation technology is significant. It is from this point of view, this weak current grounding technology of system engineering and discussion on the construction and management of key points for introduction to architectural engineering construction management of mechanical and electrical installation technology, has a certain significance, and the reference value.
Keywords: key points for quality control of mechanical and electrical installation of emerging technologies
[中图分类号] TU85[文献标识码]B [文章编号]
机电安装工程的施工通过技术更新和改造,能有效地保证工程质量,能降低工程成本,增加经济效益;但反过来说,如果不重视建筑现场的施工安装技术和质量,就会造成严重的工程质量事故,或给企业造成巨大的不可挽回的经济损失和社会影响。现场施工中上道工序的完成就是下道工序开始的条件和基础。
1、机电安装
机电安装工程作为建筑施工项目中的一个重要组成部分,其质量直接影响到建筑物整体设备的安全运行、节能效果及建筑物投入使用后的使用功能,因此直接关系到该建筑的社会效益及经济效益,机电安装工程项目越来越广泛,涉及工业、民用、公用工程中的各类设备、电气、给排水、采暖、通风、消防、通信及自动化控制系统的安装。机电安装工程贯穿在整个工程施工过程中,主要部分在结构工程结束以后开始施工,并在装饰工程开始以前基本结束,所以对整个工期有重要影响;机电安装工程的质量对工程竣工后的使用功能有着关键作用,要求施工单位在施工过程中严格把关。
2、机电安装新兴技术
機电安装施工过程中,涉及施工过程中采用新技术、新工艺、新材料、新设备等新兴技术。目前工业规模日益扩大,安装工程也越来越大。大型工程对吊装、装配、检测技术的要求越来越高。这就需要不断更新施工质量技术及施工设备。
2.1 施工准备工作
电器工程在施工前应做好充分的劳动力、施工机械、工程材料设备、施工图纸、场地各方面的准备。
2.2 预埋线管、孔洞,防雷接地焊接
在土建进行底板、结构施工时,电器工程必须配合土建专业进行预留预埋工作,主要包括线槽、桥架穿越楼板、剪力墙处的孔洞预埋,动力、照明和智能化系统电气管线预埋及防雷接地的焊接。电气管线的预埋将根据电气专业管线图进行,严格按照相关规程规范施工。
2.3 楼板暗敷管线
楼板暗敷的电气管线敷设在楼板内的两层钢筋网之间,因此预埋线管的工作必须在楼板第一层钢筋网之后进行,并且最好在第二层钢筋网编扎之前完成。
2.4 墙壁内暗敷的电气管线
从楼板引上或引下的管线均应处于相应的墙壁内,在进行墙壁的砌体时,就要做好终端线盒的定位工作,满足设计、规范的要求。由于砌体后,线盒的位置尺寸再也不能修正,因此必须一次定位准确。
2.5 放线、支架制安
明装线管和线槽、桥架在安装前均要进行放线支架制安工作,线管的支架采用线卡直接安装在楼板或墙上,线槽采用角铁支架,桥架和母线采用厂家生产的专用支架。支架间距必须符合相应规定。
3、机电安装工程的竣工验收及管理
3.1 机电安装工程验收的依据
机电安装的竣工验收一般依据:可行性研究报告;施工图设计及设计变更通知书;设备说明书;国家现行的标准、规范;建筑安装工程统计规定及主管部门关于工程竣工规定;涉及进口设备或是引进外资的工程,应按照合同约定和世界银行的规定按时编制项目完成报告。
3.2 机电安装工程验收标准
机电安装工程的验收标准:必须符合合同规定和实际文件要求,符合国家现行的施工验收规范,工程全部完成,无漏项,主要工艺设备、配套设施经联动负荷调试合格,形成生产使用的能力或功能;交工资料齐全达到归档要求;生产准备工作适应投产的需要;环境保护、劳动安全卫生、消防设施已按要求建成使用;少数非主要设备虽未按实际规定的内容全部建成。
3.3 机电安装工程竣工结算管理
机电安装工程项目已完工,并已经过验收签证,交工资料已整理汇总完毕并经有关责任方签字认可;施工图预算以及应调整的工程造价已编制完毕;设计变更等技术核定单等签证手续已办完;项目部即可向工程发包方进行最终的工程价款结算。
4、机电安装工程的质量控制
为使包括弱电系统的建筑机电机电安装工程顺利进行,质量优良,必须进行质量控制,这就需要进行全过程质量管理和控制。
4.1 配合阶段的质量控制
该阶段是指在土建的结构施工阶段,要精确做好预埋工作。
4.2 毛坯阶段的质量控制
毛坯阶段是指在土建拆模并出清现场后,安装工程全面开始施
工至可进行装饰工程为止。
4.3 装饰阶段的质量控制
装饰阶段的安装属于配合性质。主要进行强电、弱电、照明的施工,喷淋头的安装,卫生洁具的安装、镶接、校水工作等。
4.4 综合调试阶段的质量控制
综合调试是整个机电安装工程的最后阶段,它对整个工程能否正常启用,起到关键作用。
5、结论
综上所述,机电安装工程作为建筑施工项目中一个重要部分,与人民生活和国家发展息息相关。提高建筑的舒适性、安全性、高效性,其实机电安装至关重要。机电安装项目管理是一个动态管理过程,在整个过程中还要对工程材料、设备采购、特种设备及作业、施工机具、技术档案资料的处理,加强建筑机电安装工程施工管理技术是当前建筑工程质量控制的关键。做好建筑机电安装工程施工管理技术工作意义重大。因此,应在工作实践中不断学习,提高认识和知识,更好地做好质量控制及管理工作,逐步提高建筑工程机电安装的管理技术。
参考文献:
[1] 胡博生机电安装工程项目管理探讨[J]建筑与工程2007(34)
[2]麻蓉莉浅谈机电安装工程施工技术与质量管理[J]矿山机械2007(9)
[3]黄村显潘明熄工程项目建设的投资控制与管理[J]珠江水运2005(7)
关键词:机电安装新兴技术质量控制技术要点
Abstract: building mechanical and electrical installation engineering is the construction project of touch in a ring, bears architectural lighting and intelligent functions, improving the management of mechanical and electrical installation technology is significant. It is from this point of view, this weak current grounding technology of system engineering and discussion on the construction and management of key points for introduction to architectural engineering construction management of mechanical and electrical installation technology, has a certain significance, and the reference value.
Keywords: key points for quality control of mechanical and electrical installation of emerging technologies
[中图分类号] TU85[文献标识码]B [文章编号]
机电安装工程的施工通过技术更新和改造,能有效地保证工程质量,能降低工程成本,增加经济效益;但反过来说,如果不重视建筑现场的施工安装技术和质量,就会造成严重的工程质量事故,或给企业造成巨大的不可挽回的经济损失和社会影响。现场施工中上道工序的完成就是下道工序开始的条件和基础。
1、机电安装
机电安装工程作为建筑施工项目中的一个重要组成部分,其质量直接影响到建筑物整体设备的安全运行、节能效果及建筑物投入使用后的使用功能,因此直接关系到该建筑的社会效益及经济效益,机电安装工程项目越来越广泛,涉及工业、民用、公用工程中的各类设备、电气、给排水、采暖、通风、消防、通信及自动化控制系统的安装。机电安装工程贯穿在整个工程施工过程中,主要部分在结构工程结束以后开始施工,并在装饰工程开始以前基本结束,所以对整个工期有重要影响;机电安装工程的质量对工程竣工后的使用功能有着关键作用,要求施工单位在施工过程中严格把关。
2、机电安装新兴技术
機电安装施工过程中,涉及施工过程中采用新技术、新工艺、新材料、新设备等新兴技术。目前工业规模日益扩大,安装工程也越来越大。大型工程对吊装、装配、检测技术的要求越来越高。这就需要不断更新施工质量技术及施工设备。
2.1 施工准备工作
电器工程在施工前应做好充分的劳动力、施工机械、工程材料设备、施工图纸、场地各方面的准备。
2.2 预埋线管、孔洞,防雷接地焊接
在土建进行底板、结构施工时,电器工程必须配合土建专业进行预留预埋工作,主要包括线槽、桥架穿越楼板、剪力墙处的孔洞预埋,动力、照明和智能化系统电气管线预埋及防雷接地的焊接。电气管线的预埋将根据电气专业管线图进行,严格按照相关规程规范施工。
2.3 楼板暗敷管线
楼板暗敷的电气管线敷设在楼板内的两层钢筋网之间,因此预埋线管的工作必须在楼板第一层钢筋网之后进行,并且最好在第二层钢筋网编扎之前完成。
2.4 墙壁内暗敷的电气管线
从楼板引上或引下的管线均应处于相应的墙壁内,在进行墙壁的砌体时,就要做好终端线盒的定位工作,满足设计、规范的要求。由于砌体后,线盒的位置尺寸再也不能修正,因此必须一次定位准确。
2.5 放线、支架制安
明装线管和线槽、桥架在安装前均要进行放线支架制安工作,线管的支架采用线卡直接安装在楼板或墙上,线槽采用角铁支架,桥架和母线采用厂家生产的专用支架。支架间距必须符合相应规定。
3、机电安装工程的竣工验收及管理
3.1 机电安装工程验收的依据
机电安装的竣工验收一般依据:可行性研究报告;施工图设计及设计变更通知书;设备说明书;国家现行的标准、规范;建筑安装工程统计规定及主管部门关于工程竣工规定;涉及进口设备或是引进外资的工程,应按照合同约定和世界银行的规定按时编制项目完成报告。
3.2 机电安装工程验收标准
机电安装工程的验收标准:必须符合合同规定和实际文件要求,符合国家现行的施工验收规范,工程全部完成,无漏项,主要工艺设备、配套设施经联动负荷调试合格,形成生产使用的能力或功能;交工资料齐全达到归档要求;生产准备工作适应投产的需要;环境保护、劳动安全卫生、消防设施已按要求建成使用;少数非主要设备虽未按实际规定的内容全部建成。
3.3 机电安装工程竣工结算管理
机电安装工程项目已完工,并已经过验收签证,交工资料已整理汇总完毕并经有关责任方签字认可;施工图预算以及应调整的工程造价已编制完毕;设计变更等技术核定单等签证手续已办完;项目部即可向工程发包方进行最终的工程价款结算。
4、机电安装工程的质量控制
为使包括弱电系统的建筑机电机电安装工程顺利进行,质量优良,必须进行质量控制,这就需要进行全过程质量管理和控制。
4.1 配合阶段的质量控制
该阶段是指在土建的结构施工阶段,要精确做好预埋工作。
4.2 毛坯阶段的质量控制
毛坯阶段是指在土建拆模并出清现场后,安装工程全面开始施
工至可进行装饰工程为止。
4.3 装饰阶段的质量控制
装饰阶段的安装属于配合性质。主要进行强电、弱电、照明的施工,喷淋头的安装,卫生洁具的安装、镶接、校水工作等。
4.4 综合调试阶段的质量控制
综合调试是整个机电安装工程的最后阶段,它对整个工程能否正常启用,起到关键作用。
5、结论
综上所述,机电安装工程作为建筑施工项目中一个重要部分,与人民生活和国家发展息息相关。提高建筑的舒适性、安全性、高效性,其实机电安装至关重要。机电安装项目管理是一个动态管理过程,在整个过程中还要对工程材料、设备采购、特种设备及作业、施工机具、技术档案资料的处理,加强建筑机电安装工程施工管理技术是当前建筑工程质量控制的关键。做好建筑机电安装工程施工管理技术工作意义重大。因此,应在工作实践中不断学习,提高认识和知识,更好地做好质量控制及管理工作,逐步提高建筑工程机电安装的管理技术。