论文部分内容阅读
目前供水企业的取水泵普遍设计扬程较高,耗电量大。本文对原阳泵站取水泵的具体配置及运行情况进行分析,提出技改方案并详细介绍了改造过程,最后进行了经济效益分析并对取水泵今后的扬程设计、水泵选型提出了建议。
At present, water supply enterprises generally have a higher head lift and higher power consumption. This paper analyzes the specific configuration and operation of the intake pump in Yuanyang Pumping Station, puts forward the technical innovation plan and introduces the reforming process in detail. At last, it analyzes the economic benefits and puts forward suggestions on the future head design and pump selection of the intake pump.