黄河下游的洪水危害,是我国历史上长期没有解决的问题。黄河河道居高临下,北决乱海,南决乱准。这条桀骜不驯的大河既为我国政治、经济和文化的发展作出过巨大的贡献,也给沿黄人民带来不少沉重的灾难。人民治黄以来,党中央的各级党委对治黄极为重视,沿黄人民付出了巨大的劳动,取得了三十八年伏秋大汛不决口的伟大胜利。但是,由于黄河洪水,泥沙至今尚未得到完全控制,河床不断淤高,河势摆动加剧,使下游防洪负担加重,不仅防御特大洪水的问题没有解决,就是中常洪水也有危险。因此黄河下游防洪问题仍然是众所瞩目的问题。本文就黄河下游的防洪任务和防洪措施黄河下游的洪水危害,是我国历史上长期没有解决的问题。黄河河道居高临下,北决乱海,南决乱准。这条桀骜不驯的大河既为我国政治、经济和文化的发展作出过巨大的贡献,也给沿黄人民带来不少沉重的灾难。人民治黄以来,党中央的各级党委对治黄极为重视,沿黄人民付出了巨大的劳动,取得了三十八年伏秋大汛不决口的伟大胜利。但是,由于黄河洪水,泥沙至今尚未得到完全控制,河床不断淤高,河势摆动加剧,使下游防洪负担加重,不仅防御特大洪水的问题没有解决,就是中常洪水也有危险。因此黄河下游防洪问题仍然是众所瞩目的问题。本文就黄河下游的防洪任务和防洪措施 Flood damage in the lower reaches of the Yellow River is a long-standing problem that has not been solved in the history of our country. The Yellow River condescending, the North decided to indiscriminately sea, the South decided to be arbitrary. This unruffled river not only made tremendous contributions to the political, economic and cultural development of our country but also brought many heavy catastrophes to the people along the Yellow River. Since the people’s political rights were rectified, the CPC Central Committee’s party committees at all levels attach great importance to the rectification of the Yellow River and the huge work carried out by the people along the Yellow River has made great victories in the big flood of 38 years. However, due to the Yellow River flood, the sediment has not yet been fully controlled, the siltation of the riverbed is constantly increasing, and the swinging of the river is aggravating, thus increasing the flood control burden on the lower reaches. Not only the problem of defensive floods is not solved, but the flood of the Central Plains is also dangerous. Therefore, the flood control in the lower reaches of the Yellow River is still the focus of attention. In this paper, flood control tasks and flood control measures in the lower reaches of the Yellow River flood damage in the lower reaches of the Yellow River is a long-standing problem that has not been solved in our history. The Yellow River condescending, the North decided to indiscriminately sea, the South decided to be arbitrary. This unruffled river not only made tremendous contributions to the political, economic and cultural development of our country but also brought many heavy catastrophes to the people along the Yellow River. Since the people’s political rights were rectified, the CPC Central Committee’s party committees at all levels attach great importance to the rectification of the Yellow River and the huge work carried out by the people along the Yellow River has made great victories in the big flood of 38 years. However, due to the Yellow River flood, the sediment has not yet been fully controlled, the siltation of the riverbed is constantly increasing, and the swinging of the river is aggravating, thus increasing the flood control burden on the lower reaches. Not only the problem of defensive floods is not solved, but the flood of the Central Plains is also dangerous. Therefore, the flood control in the lower reaches of the Yellow River is still the focus of attention. In this paper, the Yellow River flood control tasks and flood control measures
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
△最高水头的混流式水轮发电机组:奥地利劳斯亥克电站机组,水头672米,出力5.84万千瓦。△最高水头的冲击式水轮发电机组:奥地利莱克电站机组,水头17712.5米,出力1.25万千瓦
越南因进行建设,目前急需中国产各种油漆,并希望进行贸易合作。一是要求在河内设中国油漆的代理商,特别是销售各种海船防锈、交易安全反光和各种建筑工程涂墙油漆;二是若暂
台湾“经济部国贸局”最近修订了《台湾地区与大陆贸易许可办法》,将原来进口大陆物品须由“国贸局”核发进口许可证的做法,改为第一阶段授权银行鉴证,第二阶段免进口许可证
随着我国工业化程度的不断加深,企业对于数控操作人员的要求越来越高,这也就进一步提高了各大高职高专数控课程教学的标准与要求,因此各大高职高专数控课程教师应该进一步创
本文介绍不规则曲面的自动测绘方法和理论分析,并以水轮机叶片为例,叙述计算机绘图的方法和步骤,其同目前常用的测绘方法相比,具有速度快、精确性高的优点,因而为轴流式水轮
第一条中央防汛总指挥部(以下简称本部)为鼓励防汛人员在洪水期间,克尽职守,加强堤防之安全,以消除水患,特制定本办法。第二条所有参加防汛工作之人员,如民工、干部、主管人
自从政务院发布「关于一九五○年水利春修工程的指示」以后,全国各地春修工程均已大力展开。据不完全的统计,黄河复堤整险预计一千三百余万公方,截止三月底,山东平原两省已
应用混匀消光颗分法测定河流泥沙颗分的研究,在我国已取得较大的进展,我们先前研制成的 GDY-1型光电颗分仪,现已在我国一些生产及科研单位使用,其性能见文献[1]、[2][3]。实
前言防漂浮筒的作用是使漂浮物偏离进水口,对水电站和热电站冷却水系统的泵站进水口都适用. 两种进水口防漂浮筒的工作条件是不相同的.浮筒在运行期的两种工作情况如下: (1)