论文部分内容阅读
“赶工期”真正“赶”走的是建设施工的科学性和规律性,给建设工程埋下安全隐患,破坏安全文化,从而使不发生安全事故成为偶然,使发生安全事故成为必然。“协力奋战一百天!”由中国能源建设集团公司下属的中国电力工程顾问集团中南电力设计院总承包的江西丰城发电厂三期在建项目,在提出这个“响亮”口号后的第72天,发生了令全国电力人震惊的冷却塔施工平台坍塌特别重大事故,74条生命瞬间陨落,另有2人受伤。“这是今年死亡人数最多的事故,也是近十几年来电力行业伤亡最为严重的一次事故,影响恶劣,教训惨痛。”国务院
“Catch-up period ” “real ” catch “take the construction of scientific and regularity, to the construction project buried security risks, undermining the safety culture, so that accidents do not occur by accident, so that accidents have become inevitable. ”Strive for one hundred days! “ By the China Energy Construction Corporation under the China Power Engineering Consultants Group, South China Electric Power Design Institute, general contracting Jiangxi Fengcheng power plant under construction in the third phase, put forward this ”loud“ slogan On the 72nd day, a particularly serious accident occurred in the cooling tower construction platform, which shocked the national power people. 74 lives instantly fell and another two were injured. ”This is the most fatal accident this year, but also the most serious casualty in the power industry in the past decade, which has had a bad influence and a painful lesson.“ ”The State Council