论文部分内容阅读
1985年12月3~5日,铁道部科技局在铁科院召开了由铁科院机辆所完成的《重载列车成套技术环行线牵引运行试验》、《103-1型货车空气分配阀》和《货车制动空重位自动调整器》等属于国家重载攻关项目的三个分项的部级鉴定。出席鉴定会的单位除铁道部有关局外,还有科研单位、大专院校、工厂和路局等。与会的专家、学者和工程技术人员共50余人。
From December 3 to December 5, 1985, the Science and Technology Bureau of the Ministry of Railways held a trial run of traction operation of a complete line of heavy-haul train technology carried out by the ASTRI vehicles at the ASTRI. The Model 103-1 Air Distribution Valve “And” truck brake empty reset automatic "belongs to the national heavy-duty tackle project of the three sub-ministerial identification. Attend the appraisal unit in addition to the relevant Bureau of the Ministry of Railways, there are scientific research units, universities, factories and road bureau. Participating experts, scholars and engineering and technical personnel a total of more than 50 people.