2005年全路电务系统针对生产布局调整,界定电务处、电务段两级安全管理和专业管理职责,全面开展整章建制工作,深入开展反违章活动;同时强化信号安全生产维护工作。结合提速安全标准线建设和第六次提速,电务系统启动200km/h区段的CTCS2级列控工程,京沪线电气化改造、青藏线建设、大秦线2亿t扩能改造等重点工程进展顺利。2006年以第六次提速为重点,建立与新的管理体制相适应的电务专业管理模式,坚决杜绝恶性违章作业;落实电务系统应急预案,为开行200km/h动车组,实施列控地面设备的技术改造;还将完成京沪线电气化信号配套改造工程,确保青藏线按期开通,全面建成TDCS,胶济、郑徐、浙赣等线的CTC,青藏、大秦、胶济线GSM-R和电务信息管理系统。
In 2005, the entire service system adjusted the layout of production to define the two levels of security management and professional management duties of the department of telecommunications and the department of telecommunications, fully developed the entire chapter and started anti-illegal activities in an all-round way, and at the same time strengthened the work of signal safety production and maintenance. Combined with the construction of the speeding up safety standard line and the sixth acceleration, the progress of key projects such as the CTCS2-level train control project of 200km / h in the power system, the electrification of Beijing-Shanghai line, the construction of Qinghai-Tibet line and the expansion of 200 million t in Daqin Line smoothly. In 2006, the sixth speed-up focused on establishing a professional management mode of electric power corresponding to the new management system and resolutely putting an end to malicious and illegal operations. The emergency plan of the electric power system was implemented. For the purpose of operating a 200km / h EMU and implementing train control ground Equipment, technical transformation; will also complete the Beijing-Shanghai electrification signal matching renovation project to ensure that the Qinghai-Tibet line opened on schedule, the full completion of TDCS, Jiaoji, Zheng Xu, Zhejiang-Jiangxi line CTC, And service information management system.