河南省南水北调受水区安阳供水配套工程已经建成,并于2015年12月正式投入运行,为保证下游水厂的正常用水,加快工程巡查进度、提高管护效率、降低管护成本,结合工程运行管理的实际情况从工程运行期间应急抢险、日常巡查、维修管护、年度岁修大修的方便快捷和低成本以及配套工程水量的计量准确性等视角,提出了从应急抢险的角度考虑管线平面布置、阀井的位置布置、管件的内衬形式、应急抢险合拢管的优化设计和从工程日常巡查、维护方便考虑的阀井高度、井盖加锁、阀井通风、阀井集水井的位置、阀井底板形式、管件外防腐形式和管道内外接缝等设计建议,并提出为保证供用水双方在供水初期水量的计量准确性,应完善计量装置。
Anyang Water Supply Project of South-to-North Water Diversion Project in Henan Province has been completed and put into operation in December 2015. In order to ensure the normal water use of downstream waterworks, speed up the progress of project inspections, improve the efficiency of management and protection, reduce the cost of management and protection, The actual situation of management From the perspectives of emergency rescue, daily inspection, maintenance management and maintenance, annual convenient repair and low cost and the measurement accuracy of supporting engineering water during the project operation period, Valve well layout, the lining of the form of pipe fittings, the emergency rescue close together the optimal design of the pipe and from the daily inspection of the project, easy to maintain the consideration of the valve well height, cover lock, valve well ventilation, well valve well position, valve well The form of the bottom plate, the outer anticorrosive form of the pipe fitting and the seams inside and outside the pipe, etc. It is suggested that the measuring device should be perfected in order to ensure the measurement accuracy of the water quantity supplied by both parties.