【摘 要】
:
2015年主要完成同位素电磁分离器综合技术改造项目的安装、调试、试运行及验收工作。按进度要求,2015年6月30日,完成了项目综合调试并实现系统稳定运行。2015年9月30日,完成
论文部分内容阅读
2015年主要完成同位素电磁分离器综合技术改造项目的安装、调试、试运行及验收工作。按进度要求,2015年6月30日,完成了项目综合调试并实现系统稳定运行。2015年9月30日,完成了项目所有建设内容,实现批复建设指标。2015年11月,完成了项目的审计验收工作。全年进行铷同位素的分离、提取、纯化,开机约1 500h,平时对设施进行日常清洗、维护、保养工作。
In 2015, it mainly completed the installation, commissioning, commissioning and acceptance of the comprehensive technical transformation of the electromagnetic separator for isotopes. As required by the progress, on June 30, 2015, the comprehensive commissioning of the project was completed and the system was in stable operation. On September 30, 2015, all construction contents of the project were completed, and approved construction indicators. In November 2015, the project audit and acceptance was completed. The annual rubidium isotope separation, extraction, purification, boot about 1 500h, usually on the facilities for routine cleaning, maintenance and repair work.
其他文献
The explosives detection technology based on nuclear quadrupole resonance(NQR)is by means of detection of specific NQR signal of the14 N nuclei.It detects the e
经过长期酝酿、周密规划京津冀布阵完毕,整装待发多方合力推动之下协同发展战略即将全速启航
After long-term brewing, careful planning of the Beijing-Tianjin-Hebei li
一句老话:见了女人莫问年龄,见了男人莫问收入。一句新话:单位换一换,收入翻几番。问你问我又问他:对自己的收入满意吗? 十有八九噘着嘴答:不满意!
An old saying goes: I m
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
Gamma-ray total absorption facility(GTAF)is composed of 40 pieces of BaF_2 detector,which will be used to accurately measure the neutron capture cross section i
Tissue equivalent proportional counter(TEPC)can differentiate the dose equivalent contributed from neutron and gamma ray in a mixture field and measure absorb d
The potential of silicon carbide(SiC)for use in semiconductor nuclear radiation detectors has been recognized for years.SiC detectors have now been demonstrated
Neutron noise refers to the statistical fluctuation of the great number of neutrons in nuclear reactor,through the analysis of the fluctuation,the reactor’s ch
The y-ray total absorption facility(GTAF)constructed at China Institute of Atomic Energy(CIAE)is aimed to measure neutron capture cross-sections with high accur
目的观察中西医结合治疗小儿反复呼吸道感染的临床疗效。方法将90例反复呼吸道感染患儿随机分为治疗组和对照组,各45例。对照组给予卡介苗和葡萄糖酸锌口服液,治疗组在对照组