(一)动力组工作概况动力组为了积极准备这次大会,曾组织了在京的有关科研机构、设计机构及高等学校,于5月15日至24日在北京开了预备会议,请长办、水利电力部系统设计院的有关工程师及苏联专家,介绍了三峡水利枢纽(动力部份)及三峡动力系统的概况,并提出了科研任务,经小组讨论,草拟了科研项目45项,接着,于5月28日又派遣了由各单位组成的工作组先行来武汉与长办及水利电力部系统设计院一起进行筹备。此次大会,共有27个单位,69位代表参加,分成系统规划及动能经济;远距离输电;水电站及动力系统自动化三个分组,经过10天的紧张工作,将
(1) Overview of the work of the power group In order to actively prepare for this conference, the power group organized relevant scientific research institutes, design institutes, and colleges and universities in Beijing and held a preparatory meeting in Beijing from May 15th to 24th. The engineers of the Ministry of Water Resources and Electric Power System Design Institute and the Soviet experts introduced the general situation of the Three Gorges Water Control Project (power section) and the Three Gorges Power System, and proposed scientific research tasks. After group discussions, 45 scientific research projects were drafted. On May 28th, a working group composed of various units was dispatched to Wuhan to work with Long Office and the System Design Institute of the Ministry of Water Resources and Electric Power to prepare for the project. The conference, a total of 27 units, 69 delegates participated in, divided into system planning and kinetic energy; long-distance transmission; hydropower station and power system automation three groups, after 10 days of intense work, will