后浇带是包括基础及上部结构在内的整个建筑物施工中的预留缝,待高层主体结构完成后再将后浇带混凝土补齐。在整个主体结构施工中既解决了高层主体与低层裙房的差异沉降,又达到了不设永久变形缝的目的。
After pouring belt is the foundation and superstructure, including the entire building, including the construction of the pre-seams to be completed after the completion of the main structure of the post-pouring concrete filled. In the whole construction of the main structure not only solved the differential settlement between the high-rise main body and the lower podium, but also achieved the purpose of no permanent deformation seam.