彭水水利枢纽电站厂房布置方案研究

来源 :人民长江 | 被引量 : 0次 | 上传用户:ltzmh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
彭水坝址处于高山峡谷地区,电站厂房引水系统长达860 m 。为了较好地解决长引水系统、大跨度洞室群分布密集的难题,设计中结合实际,跟踪水电站长尾水道设计理论和实践的发展,在国内首次进行了变顶高尾水洞的设计研究,解决了“长引水系统不设调压室,且尾水系统明满流交替”的主要技术问题。用变顶高尾水洞取代调压室,既可保证电站的安全运行和减小工程投资,又避免了大跨度洞室群分布密集给围岩稳定带来的不利影响。通过厂房布置方案的比较研究,推荐采用中部开发的变顶高尾水洞方案 Peng dam site in the alpine valley area, power plant water intake system up to 860 m. In order to solve the problem of long-diversion system and large-span cavern group with dense distribution, the design of tracking tailrace design theory and practice of the hydropower station is combined with the actual design in the design. For the first time, Solved the “long diversion system does not set the pressure chamber, and the tail water system to open a full flow of alternating” the main technical issues. Replacing the surge chamber with a variable height tail tunnel can not only ensure the safe operation of the power station and reduce the project investment, but also avoid the unfavorable influence brought by the dense distribution of long-span caverns to the surrounding rock. Through the comparison of the plant layout plan, it is recommended to adopt the scheme of variable-height high-tail tunnel developed in Central China
其他文献
目的探讨高频超声检测乳腺肿块内微钙化灶在乳腺癌诊断中的应用价值。方法对112例合并钙化的乳腺肿块患者进行高频超声检测,重点观察肿块内钙化灶大小、形状、数目及分布特征,
中国现有各类堤防达25万km,多数堤防是经历代培修加固而成,年代久远,最早的堤防可追溯到公元前500多年,距今已有2 500多年的历史.堤防的修筑技术不断提高,日臻完善,特别是土
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
由于柘溪水库防洪库容不足,泄量大,资水河道逐年淤积,行洪能力减弱,沿岸防洪设施标准不高,非工程措施滞后等因素,致使资水中下游常遭遇特大洪灾.通过对洪灾成因分析,提出了减
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥