目前,计算机2000年问题(以下简称Y2K)随着世纪末的来临已进入倒计时阶段,各个行业都越来越重视并着手解决。渭河发电有限公司目前装机容量1300MW,是西北最大的火电厂,设备运行状况对整个电网的安全有着举足轻重的作用。由于我公司生产现场设备自动化程度较
At present, the problem of computer 2000 (hereinafter referred to as Y2K) has entered the countdown phase with the advent of the end of the century, and various industries are paying more and more attention to solving this problem. Weihe Power Generation Co., Ltd. currently installed capacity of 1300MW, is the largest thermal power plant in the northwest, equipment operation status of the entire power grid has a decisive role. Because of my company production site automation degree